Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 76.5 m = 251.0 ft
Main Spans: 2 at 25.3 m = 83.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 20.2 m = 66.3 ft (5 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 20.4 m = 66.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Upper Darby [79000]: Delaware County [045], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
PHILADELPHIA CITY 27D11
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Serious [3]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 23147 (2019) and Trucks: 4%
Future ADT: 24899 (In 2035
)