BROAD STREET over SEPTA (Route: 611)
Num:38678x
Open: no restriction [A]
Built: 1921, Reconstructed: 1971
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Orthotropic [08]
Approach Span(s): Other [00]
Deck: Steel plate (includes orthotropic) [5] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 1 at 32.3 m = 106.0 ft
Approach Spans: 0
Skew: 59
Width, Roadway: 21 m = 68.9 ft (7 Lanes) and Out-To-Out: 34.4 m = 112.9 ft for a 21 m = 68.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
NORTH PHILADELPHIA3590F02
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 45937 (2019) and Trucks: 4%
Future ADT: 51322 (In 2032 )
Glenwood Avenue over SEPTA (Route: 0)
Num:39150x
Posted for load [P]
Built: 1912, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 21.9 m = 71.9 ft
Main Spans: 1 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 17.6 m = 57.7 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
at 15th Street 3590-E1
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 22.7 metric ton = 25.0 tons (Allowable Stress(AS) [2])
Inventory: 10.9 metric ton = 12.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6000 (2017) and Trucks: 1%
Future ADT: 7000 (In 2037 )
5TH STREET over CONRAIL;RICHMOND BRANCH (Route: 0)
Num:38829x
Posted for load [P]
Built: 1918, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.7 m = 58.1 ft
Main Spans: 1 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 17.7 m = 58.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
NEAR ALLEGHENY AVE3590H01
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Inventory: 15.4 metric ton = 16.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8147 (2019) and Trucks: 5%
Future ADT: 16062 (In 2032 )
Seventeenth Street over SEPTA (Route: 0)
Num:39110x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.4 m = 139.1 ft
Main Spans: 1 at 41.1 m = 134.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 20.8 m = 68.2 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
at Indiana Avenue 3590E1
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.6 metric ton = 68.9 tons (Allowable Stress(AS) [2])
Inventory: 48.1 metric ton = 52.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9700 (2018) and Trucks: 5%
Future ADT: 12400 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.