STRAWBERRY MANSION over SKL RIV:KELLY:W RIV:STDR (Route: 0)
Num:39231x
Open: no restriction [A]
Built: 1897, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Arch - Deck [11]
Approach Span(s): Steel [3] Truss - Deck [09]
Deck: Closed Grating [4] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 378.6 m = 1242.2 ft
Main Spans: 4 at 61 m = 200.1 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 24.2 m = 79.4 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
STRAWBERRY MANSION 3589J1
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 45.4 metric ton = 49.9 tons (Allowable Stress(AS) [2])
Inventory: 32.7 metric ton = 36.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 12580 (2018) and Trucks: 1%
Future ADT: 14500 (In 2038 )
Greenland Drive over Conrail (Route: 0)
Num:39229x
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 78.6 m = 257.9 ft
Main Spans: 1 at 38.7 m = 127.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 17.1 m = 56.1 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
W of West River Dr 28A04
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 46.3 metric ton = 50.9 tons (Allowable Stress(AS) [2])
Inventory: 21.8 metric ton = 24.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 3000 (1980) and Trucks: 0%
Future ADT: 4200 (In 2000 )
GREENLAND DRIVE over SCHUYLKILL EXWY (Route: 0)
Num:38456x
Open: no restriction [A]
Built: 1972, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 78.6 m = 257.9 ft
Main Spans: 2 at 38.7 m = 127.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 17.1 m = 56.1 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
W.STRWBRY.MNSN.BRG3589J01
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 64.4 metric ton = 70.8 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 12484 (2021) and Trucks: 8%
Future ADT: 14806 (In 2032 )
Greenland Drive over Abandoned Park Trolley (Route: 0)
Num:39233x
Open: no restriction [A]
Built: 1876, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 6.1 m = 20.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
W.WEST RIVER DRIVE 28A04
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 25.4 metric ton = 27.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 12500 (1976) and Trucks: 0%
Future ADT: 12500 (In 1976 )
RAMP D OF US-1 over RAMP CLW TO SCHUYLKILL (Route: 0)
Num:39326x
Open: no restriction [A]
Built: 1970, Reconstructed: 2012
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 1 at 33.2 m = 108.9 ft
Approach Spans: 0
Skew: 73
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
RT76;US1 INTERCHA;3479J10
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 90.7 metric ton = 99.8 tons (Load Factor(LF) [1])
Inventory: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 26743 (2021) and Trucks: 7%
Future ADT: 33494 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.