Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 1 at 8.5 m = 27.9 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 21.2 m = 69.6 ft (4 Lanes) and Out-To-Out: 22.3 m = 73.2 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
West Providence [83920]: Bedford County [009], Pennsylvania [42]
Owned by State Toll Authority [31], DOT District: 9
EVERETT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68.9 metric ton = 75.8 tons (Allowable Stress(AS) [2])
Inventory: 43.5 metric ton = 47.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 33684 (2001) and Trucks: 36%
Future ADT: 38535 (In 2030
)