HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


Lock Street over Manayunk Canal (Route: 0)
Num:52551x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 11.3 m = 37.1 ft
Main Spans: 1 at 11.3 m = 37.1 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
West of Main Street
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 51.8 metric ton = 57.0 tons (Unknown [F])
Inventory: 37.3 metric ton = 41.0 tons (Unknown [F])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 500 (2018) and Trucks: 0%
Future ADT: 610 (In 2038 )
Manayunk Avenue over Shurs Lane (Route: 0)
Num:39225x
Open: no restriction [A]
Built: 1894, Reconstructed: 1979
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 15.8 m = 51.8 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 8 m = 26.2 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
over Shurs Lane 16J02
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2500 (1978) and Trucks: 0%
Future ADT: 3500 (In 1998 )
SCHUYLKILL EXPWAY. over NORFOLK SOUTHERN (Route: 76)
Num:27280x
Open: no restriction [A]
Built: 1952, Reconstructed: 1986
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 454.2 m = 1490.2 ft
Main Spans: 8 at 42.4 m = 139.1 ft
Approach Spans: 3
Skew: 0
Width, Roadway: 21.3 m = 69.9 ft (4 Lanes) and Out-To-Out: 23.3 m = 76.4 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lower Merion [44976]: Montgomery County [091], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
PENCOYD VIADUCT 36H12
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 78.9 metric ton = 86.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 99170 (2021) and Trucks: 8%
Future ADT: 109894 (In 2032 )
COTTON STREET over MANAYUNK CANAL (Route: 0)
Num:57141x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 13.1 m = 43.0 ft
Main Spans: 3 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 8.4 m = 27.6 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Philadelphia [60000]: Philadelphia County [101], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 6
WEST OF MAIN STREET
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 18 / H 20 [4]
Operating: 18.1 metric ton = 19.9 tons ()
Inventory: 17.2 metric ton = 18.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10 (2017) and Trucks: 0%
Future ADT: 15 (In 2017 )
SCHUYLKILL EXPWAY. over RIGHTERS FERRY ROAD (Route: 76)
Num:27285x
Open: no restriction [A]
Built: 1952, Reconstructed: 1986
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 71.6 m = 234.9 ft
Main Spans: 1 at 33.5 m = 109.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 21.3 m = 69.9 ft (2 Lanes) and Out-To-Out: 23.3 m = 76.4 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lower Merion [44976]: Montgomery County [091], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
W.CITY AVE.INTERCH.40J01
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 1999 [199] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 99170 (2021) and Trucks: 8%
Future ADT: 109894 (In 2035 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact