Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 506 m = 1660.2 ft
Main Spans: 1 at 176 m = 577.5 ft
Approach Spans: 9
Skew: 0
Width, Roadway: 16.3 m = 53.5 ft (4 Lanes) and Out-To-Out: 18.2 m = 59.7 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 23.8 m = 78.1 ft
Location
Wheeling [86452]: Ohio County [069], West Virginia [54]
Owned by State Highway Agency [01], DOT District: 6
0.36 MI W OF JCT WV 2 S
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 23000 (2019) and Trucks: 28%
Future ADT: 36800 (In 2039
)