Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 139 m = 456.1 ft
Main Spans: 3 at 45.4 m = 149.0 ft
Approach Spans: 0
Skew: 50
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Newberry [53224]: York County [133], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 8
0.75 MI. N. OF STRINESTOW
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 64.5 metric ton = 71.0 tons (Unknown [F])
Inventory: 38.9 metric ton = 42.8 tons (Unknown [F])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 927 (2020) and Trucks: 6%
Future ADT: 1055 (In 2032
)