Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 3 at 13.8 m = 45.3 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Mound City [50312]: Holt County [087], Missouri [29]
Owned by County Highway Agency [02], DOT District: 1
S 6 T 62 N R 38 W
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 27.9 metric ton = 30.7 tons (Allowable Stress(AS) [2])
Inventory: 9 metric ton = 9.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 1000 (2018) and Trucks: 10%
Future ADT: 1200 (In 2038
)