Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 166.4 m = 546.0 ft
Main Spans: 5 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 17.4 m = 57.1 ft (4 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 22.3 m = 73.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Piqua [62848]: Miami County [109], Ohio [39]
Owned by State Highway Agency [01], DOT District: 7
.44MI.W. OF JCT. IR-75
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 29.2 metric ton = 32.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.7 metric ton = 25.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 3.5 km = 2.2 mi
Traffic
ADT: 13325 (2015) and Trucks: 7%
Future ADT: 18495 (In 2038
)