Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 45.4 m = 149.0 ft
Main Spans: 3 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 50
Width, Roadway: 19.2 m = 63.0 ft (5 Lanes) and Out-To-Out: 25 m = 82.0 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Springcreek [74097]: Miami County [109], Ohio [39]
Owned by County Highway Agency [02], DOT District: 7
0.10 MI N OF CR199
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 71.3 metric ton = 78.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7657 (2015) and Trucks: 4%
Future ADT: 10628 (In 2038
)