Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 20.7 m = 67.9 ft
Main Spans: 2 at 10.1 m = 33.1 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01145]: De Witt County [039], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 5
CITY OF CLINTON
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 53.8 metric ton = 59.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 175 (2018) and Trucks: 17%
Future ADT: 200 (In 2032
)