Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 47.6 m = 156.2 ft
Main Spans: 1 at 34.9 m = 114.5 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 15.5 m = 50.9 ft (2 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Provo [62470]: Utah County [049], Utah [49]
Owned by City or Municipal Highway Agency [04], DOT District: 16
500 NORTH 1800 WEST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 97.2 metric ton = 106.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 59 metric ton = 64.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2200 (2017) and Trucks: 1%
Future ADT: 2750 (In 2037
)