Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 101 m = 331.4 ft
Main Spans: 3 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.3 m = 40.4 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Warren County [171], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
00.03 N US 41
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 71.7 metric ton = 78.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 50.8 metric ton = 55.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.9 km = 1.2 mi
Traffic
ADT: 2560 (2014) and Trucks: 3%
Future ADT: 3040 (In 2034
)