Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 1 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 10.1 m = 33.1 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cecil [11792]: Washington County [125], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 12
CECIL TOWNSHIP
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 63.2 metric ton = 69.5 tons (Unknown [F])
Inventory: 48.9 metric ton = 53.8 tons (Unknown [F])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 4178 (2020) and Trucks: 13%
Future ADT: 7027 (In 2037
)