Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 37.2 m = 122.1 ft
Main Spans: 1 at 14.3 m = 46.9 ft
Approach Spans: 2
Skew: 18
Width, Roadway: 20.8 m = 68.2 ft (4 Lanes) and Out-To-Out: 22.4 m = 73.5 ft for a 16.2 m = 53.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
West Rockhill [83960]: Bucks County [017], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 6
.7MI.EAST TELFORD 20E06
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 7799 (2020) and Trucks: 12%
Future ADT: 13546 (In 2032
)