Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 89.3 m = 293.0 ft
Main Spans: 3 at 36 m = 118.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Steubenville [74608]: Jefferson County [081], Ohio [39]
Owned by State Highway Agency [01], DOT District: 11
0.92 MI N OF S.R.7
Condition
Deck: Excellent [9]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 29.2 metric ton = 32.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 3911 (2015) and Trucks: 7%
Future ADT: 18384 (In 2038
)