HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


Greensburg Pike over Turtle Creek: NSR (Route: 0)
Num:48889x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 204.8 m = 671.9 ft
Main Spans: 4 at 69.2 m = 227.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 14.9 m = 48.9 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Turtle Creek [77912]: Allegheny County [003], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 11
TL06 Turtle Creek #6
Condition
Deck: Good [7]
Superstructure: Excellent [9]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68 metric ton = 74.8 tons (Unknown [A])
Inventory: 40.8 metric ton = 44.9 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 6908 (2014) and Trucks: 5%
Future ADT: 7600 (In 2034 )
THOMPSON ST over THOMPSON RUN (Route: 0)
Num:2704x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 17.1 m = 56.1 ft
Main Spans: 1 at 16.8 m = 55.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.6 m = 31.5 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Turtle Creek [77912]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
467003 TURTLE CREEKBORO
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.1 metric ton = 84.8 tons ()
Inventory: 46.3 metric ton = 50.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4000 (2018) and Trucks: 3%
Future ADT: 4400 (In 2039 )
TRI BORO EXPY over THOMPSON RUN (Route: 130)
Num:938x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 19.8 m = 65.0 ft
Main Spans: 1 at 19.2 m = 63.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 22.9 m = 75.1 ft (6 Lanes) and Out-To-Out: 25.6 m = 84.0 ft for a 22.9 m = 75.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Turtle Creek [77912]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
TURTLE CREEK
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 82.6 metric ton = 90.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 12364 (2021) and Trucks: 7%
Future ADT: 12022 (In 2032 )
PENN AV over THOMPSON RUN (Route: 0)
Num:2703x
Open: no restriction [A]
Built: 1930, Reconstructed: 1972
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.9 m = 62.0 ft
Main Spans: 1 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Turtle Creek [77912]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
467002 OVER THOMPSON RN
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 7000 (2018) and Trucks: 4%
Future ADT: 7700 (In 2039 )
MAPLE AV over MONROEVILLE AVENUE (Route: 0)
Num:2702x
Posted for load [P]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 11.9 m = 39.0 ft
Main Spans: 1 at 11.3 m = 37.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Turtle Creek [77912]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
467001 OVER MONROE AVE
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 46.3 metric ton = 50.9 tons ()
Inventory: 28.1 metric ton = 30.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8563 (2015) and Trucks: 2%
Future ADT: 8822 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.