HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 20


SMITHFIELD STREET over I-376 & SR 8041(RAMP F) (Route: 0)
Num:1743x
Open: no restriction [A]
Built: 1954, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 47.5 m = 155.8 ft
Main Spans: 3 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.5 m = 41.0 ft (3 Lanes) and Out-To-Out: 36.2 m = 118.8 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Smithfield St Bridge
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 6075 (2020) and Trucks: 14%
Future ADT: 16015 (In 2032 )
SR 8095 (RAMP B) over SR 8041 (RAMP B) (Route: 0)
Num:2907x
Open: no restriction [A]
Built: 1956, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 92 m = 301.9 ft
Main Spans: 5 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 5.7 m = 18.7 ft (1 Lanes) and Out-To-Out: 10.9 m = 35.8 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Smithfield St Bridge
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49 metric ton = 53.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 38.1 metric ton = 41.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2256 (2019) and Trucks: 4%
Future ADT: 186 (In 2032 )
MCARDLE RDWY RD over SYCAMORE STREET (Route: 0)
Num:2424x
Open: no restriction [A]
Built: 1983, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 138.4 m = 454.1 ft
Main Spans: 3 at 56.4 m = 185.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301053 P.J. MCARDLE RDWY
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 79.8 metric ton = 87.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 11000 (2001) and Trucks: 5%
Future ADT: 12100 (In 2016 )
SYCAMORE ST over RAVINE (Route: 0)
Num:2466x
Open: no restriction [A]
Built: 1984, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 57.9 m = 190.0 ft
Main Spans: 2 at 35.4 m = 116.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11.4 m = 37.4 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301123 SYCAMORE ST (PGH)
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68.9 metric ton = 75.8 tons (Load Factor(LF) [1])
Inventory: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 1700 (2009) and Trucks: 5%
Future ADT: 1870 (In 2029 )
Smithfield Street over MONONGAHELA RIVER:CSX RR (Route: 0)
Num:1742x
Posted for load [P]
Built: 1883, Reconstructed: 1994
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 360.3 m = 1182.1 ft
Main Spans: 2 at 109.7 m = 359.9 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (3 Lanes) and Out-To-Out: 14.1 m = 46.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 5.18 m = 17.0 ft and Navigational Clearance: 131.1 m = 430.1 ft
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Smithfield Street Bridge
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Inventory: 20 metric ton = 22.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 6075 (2020) and Trucks: 14%
Future ADT: 16016 (In 2032 )
WOOD ST over I-376 WB (PARKWAY EAST) (Route: 0)
Num:2463x
Open: no restriction [A]
Built: 1939, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21.3 m = 69.9 ft
Main Spans: 1 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.7 m = 58.1 ft (4 Lanes) and Out-To-Out: 29 m = 95.1 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301120 WOOD STREET BRIDGE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 5000 (2020) and Trucks: 6%
Future ADT: 5000 (In 2037 )
FORT PITT BL over MON WHARF PARKING LOT (Route: 0)
Num:2412x
Open: no restriction [A]
Built: 2002, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 494.7 m = 1623.1 ft
Main Spans: 30 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 11.2 m = 36.7 ft (3 Lanes) and Out-To-Out: 12.3 m = 40.4 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301035 FORT PITT BLVD(EB)
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 88 metric ton = 96.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 41.7 metric ton = 45.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2018 [1118] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 15955 (2020) and Trucks: 6%
Future ADT: 17000 (In 2037 )
MARKET ST over I-376(WB):FORT PITT BLVD (Route: 0)
Num:2464x
Open: no restriction [A]
Built: 1940, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21.3 m = 69.9 ft
Main Spans: 1 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.9 m = 62.0 ft (2 Lanes) and Out-To-Out: 23.8 m = 78.1 ft for a 30.5 m = 100.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301121 MARKET ST OV PKWY
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 69.9 metric ton = 76.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 53.5 metric ton = 58.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2824 (2004) and Trucks: 6%
Future ADT: 4000 (In 2030 )
RELOCATED FT PITT over MON WHARF FLOOD WALLS (Route: 0)
Num:42018x
Open: no restriction [A]
Built: 2002, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 107 m = 351.1 ft
Main Spans: 3 at 35.4 m = 116.1 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 7.2 m = 23.6 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
RELOCATED FT PITT BLVD EB
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78 metric ton = 85.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 45.4 metric ton = 49.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13800 (2004) and Trucks: 5%
Future ADT: 15780 (In 2030 )
STANWIX ST over I-376 WB (PARKWAY EAST) (Route: 0)
Num:2455x
Open: no restriction [A]
Built: 1939, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21.6 m = 70.9 ft
Main Spans: 1 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 20.2 m = 66.3 ft (3 Lanes) and Out-To-Out: 26.4 m = 86.6 ft for a 18.9 m = 62.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301106 BT FT PITT&376E RP
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8600 (2020) and Trucks: 5%
Future ADT: 9000 (In 2037 )
Liberty Bridge over MON R:I376:0837:2 AV:ARL (Route: 0)
Num:1808x
Open: no restriction [A]
Built: 1928, Reconstructed: 1983
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Other [9] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 811.7 m = 2663.2 ft
Main Spans: 15 at 143.3 m = 470.2 ft
Approach Spans: 10
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 18.1 m = 59.4 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 508.1 m = 1667.1 ft
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Liberty Bridge
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 48.1 metric ton = 52.9 tons (Load Factor(LF) [1])
Inventory: 29 metric ton = 31.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 33281 (2020) and Trucks: 4%
Future ADT: 56825 (In 2031 )
RAMP H RD over RAMPS C:K:& D (Route: 0)
Num:2825x
Open: no restriction [A]
Built: 1968, Reconstructed: 1988
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 187.5 m = 615.2 ft
Main Spans: 3 at 33.2 m = 108.9 ft
Approach Spans: 5
Skew: 99
Width, Roadway: 6.3 m = 20.7 ft (1 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Fort Duquesne Bridge
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 4130 (2021) and Trucks: 7%
Future ADT: 6532 (In 2032 )
Blvd Al.Ramp over 1st Ave: 2nd Ave: Local (Route: 0)
Num:45326x
Open: no restriction [A]
Built: 1928, Reconstructed: 2017
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Closed Grating [4] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 131.7 m = 432.1 ft
Main Spans: 3 at 73.8 m = 242.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8 m = 26.2 ft (2 Lanes) and Out-To-Out: 8.9 m = 29.2 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Blvd.of Alies to Lib. Br
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2443 (2021) and Trucks: 7%
Future ADT: 4497 (In 2032 )
Liberty Br. ramp over 1st Ave: 2nd Ave: Local (Route: 0)
Num:45327x
Open: no restriction [A]
Built: 1928, Reconstructed: 2017
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Closed Grating [4] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 131.7 m = 432.1 ft
Main Spans: 3 at 73.8 m = 242.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8 m = 26.2 ft (2 Lanes) and Out-To-Out: 8.9 m = 29.2 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Liberty Br.to Blvd. Alies
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2708 (2021) and Trucks: 7%
Future ADT: 3648 (In 2032 )
RAMP BU over MON WHARF (Route: 0)
Num:2906x
Open: no restriction [A]
Built: 1953, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 99.1 m = 325.1 ft
Main Spans: 1 at 19.5 m = 64.0 ft
Approach Spans: 5
Skew: 99
Width, Roadway: 5.5 m = 18.0 ft (1 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Fort Pitt Bridge
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81.6 metric ton = 89.8 tons (Load Factor(LF) [1])
Inventory: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2634 (2021) and Trucks: 7%
Future ADT: 16955 (In 2032 )
MCARDLE RDWY RD over HILLSIDE (Route: 0)
Num:2425x
Open: no restriction [A]
Built: 1929, Reconstructed: 1984
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 90.8 m = 297.9 ft
Main Spans: 10 at 8.8 m = 28.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 3.7 m = 12.1 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301054 MCARDLE RDWY(UPPR)
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.2 metric ton = 83.8 tons (Load Factor(LF) [1])
Inventory: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 11000 (2005) and Trucks: 6%
Future ADT: 12000 (In 2023 )
PJ McARDLE ROADWAY over HILLSIDE (Route: 0)
Num:2430x
Open: no restriction [A]
Built: 1934, Reconstructed: 2004
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Closed Grating [4] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 113.7 m = 373.0 ft
Main Spans: 12 at 10.7 m = 35.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.7 m = 28.5 ft (2 Lanes) and Out-To-Out: 11.4 m = 37.4 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301065 MCARDLE ROADWAY #2
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 73.5 metric ton = 80.9 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 9028 (2006) and Trucks: 1%
Future ADT: 9000 (In 2019 )
SR 885 over CLIFF (Route: 885)
Num:1325x
Open: no restriction [A]
Built: 1981, Reconstructed: 2020
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 4 at 11.6 m = 38.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
300'EAST OF LIBERTY BRIDG
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 88.1 metric ton = 96.9 tons (Unknown [F])
Inventory: 83.9 metric ton = 92.3 tons (Unknown [F])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 23215 (2021) and Trucks: 9%
Future ADT: 25196 (In 2032 )
RAMP J over RAMP C (Route: 0)
Num:2819x
Open: no restriction [A]
Built: 1968, Reconstructed: 2010
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 16.8 m = 55.1 ft
Main Spans: 1 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 7.4 m = 24.3 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Fort Duquesne Bridge
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 5096 (2021) and Trucks: 7%
Future ADT: 21409 (In 2032 )
FT DUQ TO 10 ST over RAMP D & ALLEG. RIVER (Route: 0)
Num:2820x
Open: no restriction [A]
Built: 1968, Reconstructed: 1988
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 59.4 m = 194.9 ft
Main Spans: 2 at 37.8 m = 124.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 4.72 m = 15.5 ft and Navigational Clearance: 346.5 m = 1136.9 ft
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
FORT DUQ SOUTH APPROACH
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2924 (2021) and Trucks: 7%
Future ADT: 21097 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider