HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 10


BIRMINGHAM BRIDGE over MON RIVER: CSX RR (Route: 0)
Num:1640x
Open: no restriction [A]
Built: 1976, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 506.6 m = 1662.2 ft
Main Spans: 1 at 189 m = 620.1 ft
Approach Spans: 11
Skew: 99
Width, Roadway: 28.5 m = 93.5 ft (2 Lanes) and Out-To-Out: 32 m = 105.0 ft for a 28.7 m = 94.2 ft approaching roadway.
Vertical Clearance: 10.97 m = 36.0 ft and Navigational Clearance: 108.7 m = 356.6 ft
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
BIRMINGHAM BRIDGE
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Inventory: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 19244 (2020) and Trucks: 6%
Future ADT: 26062 (In 2032 )
8065 RAMP F over I-376:RAMP V: & 2ND AVE. (Route: 0)
Num:2877x
Open: no restriction [A]
Built: 1976, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 271.9 m = 892.1 ft
Main Spans: 8 at 47.9 m = 157.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9 m = 29.5 ft (1 Lanes) and Out-To-Out: 10.2 m = 33.5 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 4.47 m = 14.7 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Birmingham Bridge
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 3034 (2021) and Trucks: 7%
Future ADT: 6203 (In 2032 )
8065 RAMP E RD over I 376: RAMP V: & 2ND AVE (Route: 0)
Num:2878x
Open: no restriction [A]
Built: 1976, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 271.9 m = 892.1 ft
Main Spans: 7 at 47.9 m = 157.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.9 m = 29.2 ft (1 Lanes) and Out-To-Out: 11.9 m = 39.0 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 4.54 m = 14.9 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Birmingham Bridge
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 5750 (2021) and Trucks: 7%
Future ADT: 7698 (In 2032 )
BIRMINGHAM BRG APR over PKWY E:RP T:TRAIL:2ND AV (Route: 0)
Num:1642x
Open: no restriction [A]
Built: 1976, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 329.8 m = 1082.1 ft
Main Spans: 7 at 56.7 m = 186.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 22.5 m = 73.8 ft (2 Lanes) and Out-To-Out: 24.6 m = 80.7 ft for a 23.5 m = 77.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Birmingham Bridge
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 19244 (2020) and Trucks: 6%
Future ADT: 26062 (In 2032 )
SR 885 over CLIFF (Route: 885)
Num:1322x
Open: no restriction [A]
Built: 1950, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 61.9 m = 203.1 ft
Main Spans: 27 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7 m = 23.0 ft (2 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 7 m = 23.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Blvd of The Allies Bluffs
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.8 metric ton = 77.9 tons ()
Inventory: 42.6 metric ton = 46.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 23215 (2021) and Trucks: 9%
Future ADT: 25196 (In 2032 )
I-376 over BRADY STREET& PED. TRAIL (Route: 376)
Num:1143x
Open: no restriction [A]
Built: 1956, Reconstructed: 1985
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 352 m = 1154.9 ft
Main Spans: 15 at 25.6 m = 84.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.5 m = 34.5 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 4.34 m = 14.2 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
B & O RR: BRADY ST
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.9 metric ton = 65.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 22847 (2021) and Trucks: 8%
Future ADT: 31238 (In 2032 )
PENN LINCOLN PKWY over BRADY STREET (Route: 376)
Num:1145x
Open: no restriction [A]
Built: 1956, Reconstructed: 1985
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
BRADY ST. INTERCHANGE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68 metric ton = 74.8 tons (Load Factor(LF) [1])
Inventory: 40.8 metric ton = 44.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 22745 (2021) and Trucks: 8%
Future ADT: 31100 (In 2032 )
BLVD ALLIES WB over FORBES: BIRM E&F: BRADY (Route: 885)
Num:1320x
Open: no restriction [A]
Built: 1928, Reconstructed: 1985
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 330.1 m = 1083.1 ft
Main Spans: 24 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 4.47 m = 14.7 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Birmingham Bridge
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: HL93 [A]
Operating: 39.9 metric ton = 43.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 30.8 metric ton = 33.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 12689 (2020) and Trucks: 3%
Future ADT: 19751 (In 2032 )
RAMP S over RAMP R:02266 RPS.:FORBES (Route: 885)
Num:1321x
Open: no restriction [A]
Built: 1952, Reconstructed: 1984
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 397.2 m = 1303.2 ft
Main Spans: 20 at 30.2 m = 99.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 4.47 m = 14.7 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Birmingham Bridge
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 8060 (2020) and Trucks: 4%
Future ADT: 12518 (In 2032 )
RAMP V over BRADY ST AND RAMP T (Route: 0)
Num:2741x
Open: no restriction [A]
Built: 1956, Reconstructed: 1985
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 368.8 m = 1210.0 ft
Main Spans: 10 at 55.5 m = 182.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 5.72 m = 18.8 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
Birmingham Bridge
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 10854 (2021) and Trucks: 7%
Future ADT: 13403 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider