Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 73.8 m = 242.1 ft
Main Spans: 3 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Prospect [64780]: Marion County [101], Ohio [39]
Owned by State Highway Agency [01], DOT District: 6
1.59 MIILES EAST OF SR-4
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 68 metric ton = 74.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 2048 (2015) and Trucks: 16%
Future ADT: 2843 (In 2038
)