BridgeSeek

Nearby Bridges in NBI 2021: 4


I-65 SB over SR 25 SB/NB (Route: 65)
Num:37690x
Open: no restriction [A]
Built: 1969, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 47.2 m = 154.9 ft
Main Spans: 2 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 17.1 m = 56.1 ft (3 Lanes) and Out-To-Out: 18 m = 59.1 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lafayette [40788]: Tippecanoe County [157], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
03.04 N SR 26
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 27820 (2015) and Trucks: 34%
Future ADT: 36820 (In 2035 )
I-65 NB over SR 25 SB/NB (Route: 65)
Num:37680x
Open: no restriction [A]
Built: 1969, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 47.2 m = 154.9 ft
Main Spans: 2 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 17.1 m = 56.1 ft (3 Lanes) and Out-To-Out: 18 m = 59.1 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lafayette [40788]: Tippecanoe County [157], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
03.04 N SR 26
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 27820 (2015) and Trucks: 37%
Future ADT: 36820 (In 2035 )
SCHUYLER AVENUE over WILDCAT CREEK (Route: 0)
Num:7900185x
Open: no restriction [A]
Built: 1952, Reconstructed: 2000
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 155.8 m = 511.2 ft
Main Spans: 6 at 23.8 m = 78.1 ft
Approach Spans: 2
Skew: 30
Width, Roadway: 25.9 m = 85.0 ft (5 Lanes) and Out-To-Out: 27.6 m = 90.6 ft for a 25.9 m = 85.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tippecanoe County [157], Indiana [18]
Owned by County Highway Agency [02], DOT District: 1
00.06 SW BARTON BEACH ROA
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Inventory: 29 metric ton = 31.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 22180 (2017) and Trucks: 7%
Future ADT: 32959 (In 2038 )
CR 200N over I-65 NB/SB (Route: 0)
Num:37660x
Open: no restriction [A]
Built: 1969, Reconstructed: 2016
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 71.9 m = 235.9 ft
Main Spans: 2 at 37.6 m = 123.4 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lafayette [40788]: Tippecanoe County [157], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
00.64 S SR 25
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.8 metric ton = 66.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 55.3 metric ton = 60.8 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 1436 (2010) and Trucks: 5%
Future ADT: 2022 (In 2030 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.