HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


MAPLE AVENUE over N CHARLES STREET (Route: 0)
Num:2422x
Open: no restriction [A]
Built: 1929, Reconstructed: 1953
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.8 m = 42.0 ft
Main Spans: 1 at 11.6 m = 38.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301051 OVER N CHARLES ST
Condition
Deck: Serious [3]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: M 18 / H 20 [4]
Operating: 73.5 metric ton = 80.9 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 400 (2009) and Trucks: 5%
Future ADT: 440 (In 2029 )
SWINDELL BR over I279:HOV:RAMP G:EAST ST (Route: 0)
Num:2456x
Open: no restriction [A]
Built: 1930, Reconstructed: 1990
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 334.4 m = 1097.2 ft
Main Spans: 4 at 166.1 m = 545.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
301109 SWINDELL BRIDGE
Condition
Deck: Poor [4]
Superstructure: Serious [3]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 59 metric ton = 64.9 tons (Allowable Stress(AS) [2])
Inventory: 26.3 metric ton = 28.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 5700 (2020) and Trucks: 6%
Future ADT: 13090 (In 2037 )
MILROY ST over I-279(LR 1021)NB:SB&HOV (Route: 0)
Num:1060x
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 107.9 m = 354.0 ft
Main Spans: 3 at 64 m = 210.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.2 m = 33.5 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 11
D11136 OVER I-279
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Poor [4]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 82.6 metric ton = 90.9 tons (Load Factor(LF) [1])
Inventory: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 300 (2007) and Trucks: 10%
Future ADT: 300 (In 2020 )
SR 0279 NB SB over SUFFOLK ST. (Route: 279)
Num:1056x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 39.6 m = 129.9 ft
Main Spans: 1 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 16.5 m = 54.1 ft (3 Lanes) and Out-To-Out: 47.4 m = 155.5 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsburgh [61000]: Allegheny County [003], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 11
I-279 OVER SUFFOLK ST.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 67.1 metric ton = 73.8 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 50276 (2021) and Trucks: 8%
Future ADT: 62751 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider