Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 28.3 m = 92.9 ft
Main Spans: 1 at 25.3 m = 83.0 ft
Approach Spans: 0
Skew: 58
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.7 m = 28.5 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Perth Amboy [58200]: Middlesex County [023], New Jersey [34]
Owned by State Highway Agency [01], DOT District: 2
OVER STATE ST (CR611) NB
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 48.1 metric ton = 52.9 tons (Load Factor(LF) [1])
Inventory: 29 metric ton = 31.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3620 (2019) and Trucks: 5%
Future ADT: 4900 (In 2039
)