CO RT 519 over POHATCONG CREEK (Route: 519)
Num:2102008x
Open: no restriction [A]
Built: 1931, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 29.3 m = 96.1 ft
Main Spans: 2 at 13.4 m = 44.0 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pohatcong [59820]: Warren County [041], New Jersey [34]
Owned by County Highway Agency [02], DOT District: 1
0.1 MI SO OF CO RT 636
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Inventory: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 6337 (2019) and Trucks: 4%
Future ADT: 8052 (In 2039 )
I-78 EB over CR 519 & TRIB. POHAT. CR (Route: 78)
Num:2112153x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 71.9 m = 235.9 ft
Main Spans: 2 at 35.1 m = 115.2 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 18.3 m = 60.0 ft (3 Lanes) and Out-To-Out: 19.4 m = 63.7 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pohatcong [59820]: Warren County [041], New Jersey [34]
Owned by State Toll Authority [31], DOT District: 1
2.3 MILES E. OF DEL RIVER
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 78 metric ton = 85.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 32500 (2018) and Trucks: 24%
Future ADT: 39000 (In 2038 )
I-78 WB over CR 519 & TRIB. POHAT. CR (Route: 78)
Num:2112152x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 72.5 m = 237.9 ft
Main Spans: 2 at 35.1 m = 115.2 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 18.3 m = 60.0 ft (3 Lanes) and Out-To-Out: 19.4 m = 63.7 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pohatcong [59820]: Warren County [041], New Jersey [34]
Owned by State Toll Authority [31], DOT District: 1
2.3 MILES E OF DEL RIVER
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 78 metric ton = 85.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 32500 (2018) and Trucks: 24%
Future ADT: 39000 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.