US 24 over KICKAPOO CREEK (Route: 24)
Num:72013400000000x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 129.2 m = 423.9 ft
Main Spans: 2 at 26.5 m = 86.9 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 26.1 m = 85.6 ft (6 Lanes) and Out-To-Out: 33.9 m = 111.2 ft for a 34.7 m = 113.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00345]: Peoria County [143], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
.5 MI E OF MCKINLEY
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.8 metric ton = 72.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 40.5 metric ton = 44.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 24200 (2019) and Trucks: 7%
Future ADT: 28886 (In 2032 )
CREEK ROAD CH R51 over TRIB OF KICKAPOO CR (Route: 0)
Num:72309500000000x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00345]: Peoria County [143], Illinois [17]
Owned by County Highway Agency [02], DOT District: 4
SE1/4-24-LIMESTONE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design:
Operating: 32.4 metric ton = 35.6 tons ()
Inventory: 19.4 metric ton = 21.3 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 1750 (2017) and Trucks: 8%
Future ADT: 2283 (In 2032 )
TREASURE ST. over KICKAPOO CREEK TRIB (Route: 0)
Num:72605300000000x
Open: no restriction [A]
Built: 1993, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 15.2 m = 49.9 ft
Main Spans: 1 at 14.5 m = 47.6 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00345]: Peoria County [143], Illinois [17]
Owned by City or Municipal Highway Agency [04], DOT District: 4
S. OF FAI 474
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.8 metric ton = 59.2 tons (Unknown [D])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [D])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 700 (2017) and Trucks: 4%
Future ADT: 1009 (In 2032 )
EB I-474 over KICKAPOO CR:TZPR RR (Route: 474)
Num:72013100000000x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 235.3 m = 772.0 ft
Main Spans: 8 at 50.9 m = 167.0 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 15.1 m = 49.5 ft (2 Lanes) and Out-To-Out: 16.2 m = 53.2 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04590]: Peoria County [143], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
.25 MI S OF US 24
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 65.8 metric ton = 72.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 39.2 metric ton = 43.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13500 (2017) and Trucks: 12%
Future ADT: 15824 (In 2032 )
WB I-474 over KICKAPOO CR:TZPR RR (Route: 474)
Num:72013200000000x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 262.4 m = 860.9 ft
Main Spans: 9 at 50.9 m = 167.0 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04590]: Peoria County [143], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
.25 MI S OF US 24
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59 metric ton = 64.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13500 (2017) and Trucks: 12%
Future ADT: 15824 (In 2032 )
WB I-474 over US 24 (S. ADAMS ST.) (Route: 474)
Num:72013000000000x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 65.8 m = 215.9 ft
Main Spans: 4 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 11.8 m = 38.7 ft (2 Lanes) and Out-To-Out: 12.9 m = 42.3 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00345]: Peoria County [143], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
0.5 MI S OF PEORIA
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 82.3 metric ton = 90.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 47.3 metric ton = 52.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13500 (2017) and Trucks: 12%
Future ADT: 15824 (In 2032 )
EB I-474 over US 24 (S. ADAMS ST.) (Route: 474)
Num:72012900000000x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 65.8 m = 215.9 ft
Main Spans: 4 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 13.9 m = 45.6 ft (3 Lanes) and Out-To-Out: 15 m = 49.2 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00345]: Peoria County [143], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
0.5 MI S OF PEORIA
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 73.5 metric ton = 80.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 44.1 metric ton = 48.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14900 (2017) and Trucks: 14%
Future ADT: 15824 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.