Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 79.3 m = 260.2 ft
Main Spans: 3 at 29.9 m = 98.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 18.1 m = 59.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Warren [80108]: Huntington County [069], Indiana [18]
Owned by State Highway Agency [01], DOT District: 2
00.09 W SR 218
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 88 metric ton = 96.8 tons (Load Factor(LF) [1])
Inventory: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 2546 (2019) and Trucks: 18%
Future ADT: 5745 (In 2034
)