Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface:
Bridge Dimensions
Length: 15.5 m = 50.9 ft
Main Spans: 1 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 3.4 m = 11.2 ft (1 Lanes) and Out-To-Out: 4.1 m = 13.5 ft for a 4.6 m = 15.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Bethlehem [05650]: Hunterdon County [019], New Jersey [34]
Owned by Other State Agencies [21], DOT District: 2
4.0 MI NW I-78&CR635 JCT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 120 (2019) and Trucks: 3%
Future ADT: 146 (In 2039
)