HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 22


RTE 907L over RTE 907L: East River: SO (Route: 907)
Num:00000000223201Dx
Open: no restriction [A]
Built: 1954, Reconstructed: 1997
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Closed Grating [4] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 159.7 m = 524.0 ft
Main Spans: 18 at 15.2 m = 49.9 ft
Approach Spans: 4
Skew: 34
Width, Roadway: 8.2 m = 26.9 ft (1 Lanes) and Out-To-Out: 9.2 m = 30.2 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 14.99 m = 49.2 ft and Navigational Clearance: 0.3 m = 1.0 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.9 MI NE FDR DR+BATTERY
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.7 metric ton = 84.4 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 44892 (2019) and Trucks: 1%
Future ADT: 55351 (In 2039 )
BROOKLYN BRIDGE over I278 BKN-QNS EXP WB: FDR (Route: 0)
Num:2240019x
Posted for load [P]
Built: 1883, Reconstructed: 2016
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Suspension [13]
Approach Span(s): Masonry [8] Arch - Deck [11]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 1825.4 m = 5989.1 ft
Main Spans: 3 at 486.4 m = 1595.9 ft
Approach Spans: 72
Skew: 11
Width, Roadway: 18.3 m = 60.0 ft (6 Lanes) and Out-To-Out: 26.2 m = 86.0 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 3.65 m = 12.0 ft and Navigational Clearance: 999.9 m = 3280.7 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
BROOKLYN BR OVER EAST RVR
Condition
Deck: Very Good [8]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design: Other [C]
Operating: 2.7 metric ton = 3.0 tons ()
Inventory: 2.7 metric ton = 3.0 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 116071 (2019) and Trucks: 0%
Future ADT: 143115 (In 2039 )
SB OFFRAMP-FDR DR over SOUTH STREET (Route: 0)
Num:00000000223201Cx
Open: no restriction [A]
Built: 1954, Reconstructed: 2014
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 117.7 m = 386.2 ft
Main Spans: 8 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.9 MI NE JCT FDR &BATTERY
Condition
Deck: Very Good [8]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 79.5 metric ton = 87.5 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 39498 (2019) and Trucks: 3%
Future ADT: 48701 (In 2039 )
RTE 907L over RTE 907L: RTE 907L: RTE (Route: 907)
Num:00000000223201Ax
Open: no restriction [A]
Built: 1954, Reconstructed: 2014
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 340.2 m = 1116.2 ft
Main Spans: 14 at 31.6 m = 103.7 ft
Approach Spans: 3
Skew: 0
Width, Roadway: 5.2 m = 17.1 ft (1 Lanes) and Out-To-Out: 6.4 m = 21.0 ft for a 5.2 m = 17.1 ft approaching roadway.
Vertical Clearance: 4.85 m = 15.9 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.9 MI NE FDR DR+BATTERY
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 36759 (2019) and Trucks: 2%
Future ADT: 45323 (In 2039 )
RTE 907L over SOUTH STREET: RTE 907L (Route: 907)
Num:00000000223201Bx
Open: no restriction [A]
Built: 1954, Reconstructed: 2014
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 177.4 m = 582.0 ft
Main Spans: 7 at 25.6 m = 84.0 ft
Approach Spans: 3
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (1 Lanes) and Out-To-Out: 6.8 m = 22.3 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 5.2 m = 17.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.9 MI NE FDR DR+BATTERY
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Inventory: 28.1 metric ton = 30.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 3352 (2019) and Trucks: 2%
Future ADT: 4133 (In 2039 )
TO FDR DR N BND over TO BKLN FRM FDR: TO PARK (Route: 0)
Num:00000000224001Dx
Open: no restriction [A]
Built: 1955, Reconstructed: 1992
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 557.5 m = 1829.2 ft
Main Spans: 30 at 23.1 m = 75.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.52 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
BROOKLYN BR OVER EAST RVR
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 14.3 metric ton = 15.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 11 metric ton = 12.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 40402 (2019) and Trucks: 0%
Future ADT: 49815 (In 2039 )
RTE I278 over RTE I278: FURMAN STREET (Route: 278)
Num:2268517x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 100.6 m = 330.1 ft
Main Spans: 7 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 4.39 m = 14.4 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
ADJACENT TO FURMAN STREET
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 202650 (2002) and Trucks: 5%
Future ADT: 283710 (In 2022 )
RTE I278 over RTE I278: FURMAN STREET (Route: 278)
Num:2268518x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 76.8 m = 252.0 ft
Main Spans: 5 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
ADJACENT TO FURMAN STREET
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 144932 (2017) and Trucks: 10%
Future ADT: 185194 (In 2039 )
COLUMBIA HEIGHTS over RTE I278: RTE I278 (Route: 0)
Num:2230870x
Posted for other load-capacity restriction [R]
Built: 1948, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18 m = 59.1 ft
Main Spans: 1 at 16.7 m = 54.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (1 Lanes) and Out-To-Out: 62.5 m = 205.1 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.2 MI W I278+BKLYN BR
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 987 (2017) and Trucks: 5%
Future ADT: 1382 (In 2037 )
PEARL ST TO FDR D over PARKING LOT (Route: 0)
Num:00000000224001Fx
Posted for load [P]
Built: 1955, Reconstructed: 1992
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Closed Grating [4] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 58.8 m = 192.9 ft
Main Spans: 3 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
BROOKLYN BR OVER EAST RVR
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 23.6 metric ton = 26.0 tons (Load Factor(LF) [1])
Inventory: 13.6 metric ton = 15.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 0 (2020) and Trucks: 0%
Future ADT: 0 (In 0 )
RTE I278 over RTE I278: FURMAN STREET: (Route: 278)
Num:2268497x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 709.9 m = 2329.2 ft
Main Spans: 45 at 18.5 m = 60.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 4.19 m = 13.7 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
ADJACENT TO FURMAN STREET
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 134789 (2011) and Trucks: 9%
Future ADT: 188705 (In 2031 )
RTE I278 over RTE I278: BRKLYN PROMENA (Route: 278)
Num:2268498x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface:
Bridge Dimensions
Length: 1098.5 m = 3604.2 ft
Main Spans: 69 at 29.5 m = 96.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 4.24 m = 13.9 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
ADJACENT TO FURMAN STREET
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 144932 (2017) and Trucks: 10%
Future ADT: 185194 (In 2039 )
RTE 27 over 278IX WB: CHERRY ST: DIV (Route: 27)
Num:2240028x
Open: no restriction [A]
Built: 1909, Reconstructed: 2004
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Suspension [13]
Approach Span(s): Steel [3] Truss - Deck [09]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 1865.1 m = 6119.4 ft
Main Spans: 3 at 448 m = 1469.9 ft
Approach Spans: 40
Skew: 0
Width, Roadway: 14 m = 45.9 ft (4 Lanes) and Out-To-Out: 29.3 m = 96.1 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 4.99 m = 16.4 ft and Navigational Clearance: 41.1 m = 134.8 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
RTE 27 OVER EAST RIVER
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: Other [C]
Operating: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Inventory: 29 metric ton = 31.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of replacement [2]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 49627 (2019) and Trucks: 8%
Future ADT: 49860 (In 2039 )
RTE 27 over 278IX WB: CHERRY ST: DIV (Route: 27)
Num:2240027x
Open: no restriction [A]
Built: 1909, Reconstructed: 1992
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Suspension [13]
Approach Span(s): Steel [3] Truss - Deck [09]
Deck: Closed Grating [4] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 1772.4 m = 5815.2 ft
Main Spans: 3 at 448 m = 1469.9 ft
Approach Spans: 20
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (3 Lanes) and Out-To-Out: 32.3 m = 106.0 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 4.26 m = 14.0 ft and Navigational Clearance: 41.1 m = 134.8 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
RTE 27 OVER EAST RIVER
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of replacement [2]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 0 (2020) and Trucks: 8%
Future ADT: 0 (In 0 )
RTE I278 over Old Fulton Street S/B: R (Route: 278)
Num:2230887x
Open: no restriction [A]
Built: 1948, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 38.1 m = 125.0 ft
Main Spans: 2 at 18.8 m = 61.7 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 4.34 m = 14.2 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0.1 MI E JCT I278 & BK BR
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 72.6 metric ton = 79.9 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 134789 (2011) and Trucks: 9%
Future ADT: 188705 (In 2031 )
RTE I278 over 278I278IX2M23082: OLD FU (Route: 278)
Num:2230888x
Open: no restriction [A]
Built: 1948, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 38.1 m = 125.0 ft
Main Spans: 2 at 18.8 m = 61.7 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 9.1 m = 29.9 ft (3 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0.1 MI E JCT I278 & BK BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 57.3 metric ton = 63.0 tons ()
Inventory: 22.7 metric ton = 25.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 144932 (2017) and Trucks: 10%
Future ADT: 185194 (In 2039 )
RTE I278 over RTE I278: BROOKLYN BRIDG (Route: 278)
Num:2268508x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 164.6 m = 540.1 ft
Main Spans: 11 at 16.1 m = 52.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 4.01 m = 13.2 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
ADJACENT TO YORK STREET
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.1 metric ton = 84.8 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 120383 (2017) and Trucks: 13%
Future ADT: 153825 (In 2039 )
RTE I278 over RTE I278: YORK STREET (Route: 278)
Num:2268507x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 86.3 m = 283.2 ft
Main Spans: 6 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 4.06 m = 13.3 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
ADJACENT TO YORK STREET
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 106102 (2006) and Trucks: 10%
Future ADT: 148543 (In 2026 )
PEARL ST TO BKLYN over TO PARK DEPT YARD (Route: 0)
Num:00000000224001Cx
Posted for load [P]
Built: 1964, Reconstructed: 2013
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Closed Grating [4] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 94.5 m = 310.1 ft
Main Spans: 3 at 22.5 m = 73.8 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 4.9 m = 16.1 ft (1 Lanes) and Out-To-Out: 6.3 m = 20.7 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 4.8 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT BROOKLYN BR.OVER E.RVR
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5710 (2019) and Trucks: 1%
Future ADT: 7040 (In 2039 )
TO PEARL STREET over LAND ADJ TO BRDG (Route: 0)
Num:00000000224001Ex
Open: no restriction [A]
Built: 1968, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Closed Grating [4] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 62.2 m = 204.1 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
BROOKLYN BR OVER EAST RVR
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Inventory: 14.5 metric ton = 16.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 7035 (2019) and Trucks: 0%
Future ADT: 8674 (In 2039 )
RTE I278 over WASHINGTON ST (Route: 278)
Num:2230420x
Open: no restriction [A]
Built: 1956, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.4 m = 66.9 ft
Main Spans: 1 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.5 m = 37.7 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.1 MI E I278+BKLYN BR
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 106102 (2006) and Trucks: 10%
Future ADT: 148543 (In 2026 )
RTE I278 over WASHINGTON ST (Route: 278)
Num:2230410x
Open: no restriction [A]
Built: 1956, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.4 m = 66.9 ft
Main Spans: 1 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 10.2 m = 33.5 ft (3 Lanes) and Out-To-Out: 11.5 m = 37.7 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Kings County [047], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0.1 MI E JCT I278 & BK BR
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 120383 (2017) and Trucks: 13%
Future ADT: 153825 (In 2039 )