HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 6


SR65/117/309 E ELM over OTTAWA RIVER # (Route: 65)
Num:201340x
Open: no restriction [A]
Built: 1978, Reconstructed: 2020
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 62.9 m = 206.4 ft
Main Spans: 3 at 21.4 m = 70.2 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 15.5 m = 50.9 ft (4 Lanes) and Out-To-Out: 19.9 m = 65.3 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by State Highway Agency [01], DOT District: 1
intersect of SR65 & SR309
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 87.5 metric ton = 96.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 55.1 metric ton = 60.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 10356 (2015) and Trucks: 7%
Future ADT: 14374 (In 2038 )
LIMA - CENTRAL AVE over OTTAWA RIVER- CENTRAL AV (Route: 0)
Num:236617x
Open: no restriction [A]
Built: 2017, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.4 m = 139.1 ft
Main Spans: 2 at 20.3 m = 66.6 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by County Highway Agency [02], DOT District: 1
0.06 MI S OF ELM ST
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 64.8 metric ton = 71.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 48.6 metric ton = 53.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Superior to present desirable criteria [9]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3300 (2017) and Trucks: 3%
Future ADT: 4580 (In 2040 )
PINE STREET over OTTAWA RIVER (Route: 0)
Num:260177x
Open: no restriction [A]
Built: 1979, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 54.9 m = 180.1 ft
Main Spans: 3 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 43
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 1
100 FT.N. OF ELM STREET
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 90.7 metric ton = 99.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 61.6 metric ton = 67.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Superior to present desirable criteria [9]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2440 (2015) and Trucks: 5%
Future ADT: 3387 (In 2035 )
MAIN STREET over OTTAWA RIVER (Route: 0)
Num:260061x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 46 m = 150.9 ft
Main Spans: 3 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 15.5 m = 50.9 ft (4 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 1
1400 FT.S. OF TOWN SQUARE
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81 metric ton = 89.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 48.6 metric ton = 53.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4649 (2015) and Trucks: 5%
Future ADT: 6453 (In 2035 )
BELLEFONTAINE CR6 over OTTAWA RIVER (Route: 0)
Num:260029x
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.1 m = 138.1 ft
Main Spans: 3 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 15.5 m = 50.9 ft (3 Lanes) and Out-To-Out: 19.6 m = 64.3 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 1
2900 FT.E. OF TOWN SQUARE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35.6 metric ton = 39.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10787 (2015) and Trucks: 3%
Future ADT: 14972 (In 2035 )
ELIZABETH STREET over OTTAWA RIVER (Route: 503)
Num:260207x
Open: no restriction [A]
Built: 1993, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 43.3 m = 142.1 ft
Main Spans: 3 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 1
ELIZABETH OVER OTTAWA R.
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 61.6 metric ton = 67.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1800 (2015) and Trucks: 3%
Future ADT: 2498 (In 2035 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider