HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


NORTH STREET over OTTAWA RIVER (Route: 190)
Num:260010x
Open: no restriction [A]
Built: 2004, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 49.4 m = 162.1 ft
Main Spans: 4 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.1 m = 43.0 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 1
3500' EAST OF MAIN STREET
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 84.2 metric ton = 92.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 48.6 metric ton = 53.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8443 (2015) and Trucks: 3%
Future ADT: 11719 (In 2035 )
LIMA - HIGH ST over OTTAWA RIVER - HIGH ST (Route: 0)
Num:236640x
Open: no restriction [A]
Built: 2001, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 46 m = 150.9 ft
Main Spans: 3 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by County Highway Agency [02], DOT District: 1
.34 MI. EAST OF PINE ST.
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 97.2 metric ton = 106.9 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 71.3 metric ton = 78.4 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Superior to present desirable criteria [9]
Waterway: Superior to present desirable criteria [9] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1866 (2000) and Trucks: 4%
Future ADT: 2590 (In 2030 )
BELLEFONTAINE CR6 over OTTAWA RIVER (Route: 0)
Num:260029x
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.1 m = 138.1 ft
Main Spans: 3 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 15.5 m = 50.9 ft (3 Lanes) and Out-To-Out: 19.6 m = 64.3 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lima [43554]: Allen County [003], Ohio [39]
Owned by City or Municipal Highway Agency [04], DOT District: 1
2900 FT.E. OF TOWN SQUARE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35.6 metric ton = 39.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10787 (2015) and Trucks: 3%
Future ADT: 14972 (In 2035 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.