HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 2


TURNPIKE NSE/SNE over HACKENSACK RV & ERIE RR (Route: 95)
Num: E109830x
Open: no restriction [A]
Built: 1952, Reconstructed: 2014
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 1712.1 m = 5617.4 ft
Main Spans: 3 at 114.3 m = 375.0 ft
Approach Spans: 35
Skew: 0
Width, Roadway: 30.2 m = 99.1 ft (6 Lanes) and Out-To-Out: 32.8 m = 107.6 ft for a 30.2 m = 99.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 33.5 m = 109.9 ft
Location
Kearny [36510]: Hudson County [017], New Jersey [34]
Owned by State Toll Authority [31], DOT District: 1
2.0 MI SOUTH OF INTER 16E
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 13.9 metric ton = 15.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 10.7 metric ton = 11.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 126356 (2018) and Trucks: 13%
Future ADT: 154179 (In 2038 )
NJ TURNPIKE over BELLVILLE TPK (NJ RT 7) (Route: 95)
Num: E109020x
Open: no restriction [A]
Built: 1950, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 68.6 m = 225.1 ft
Main Spans: 3 at 67.1 m = 220.2 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 33.1 m = 108.6 ft (7 Lanes) and Out-To-Out: 35.4 m = 116.1 ft for a 33.5 m = 109.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Kearny [36510]: Hudson County [017], New Jersey [34]
Owned by State Toll Authority [31], DOT District: 1
0.1 MI NORTH OF INTER 15W
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.7 metric ton = 48.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 33.7 metric ton = 37.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 140100 (2020) and Trucks: 15%
Future ADT: 170900 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider