HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 13


RTE 25A over RTE I678: FLUSHING RIVER (Route: 25)
Num:2055802x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 445.3 m = 1461.0 ft
Main Spans: 19 at 32.6 m = 107.0 ft
Approach Spans: 21
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 16.5 m = 54.1 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 4.92 m = 16.1 ft and Navigational Clearance: 999.9 m = 3280.7 ft
Location
New York [51000]: Queens County [081], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0.1 MI E I678 + ROUTE 25A
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 24352 (2019) and Trucks: 6%
Future ADT: 24466 (In 2039 )
RTE 25A over RTE I678: FLUSHING RIVER (Route: 25)
Num:2055801x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Not applicable [N] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 445.3 m = 1461.0 ft
Main Spans: 19 at 32.6 m = 107.0 ft
Approach Spans: 21
Skew: 0
Width, Roadway: 11.9 m = 39.0 ft (3 Lanes) and Out-To-Out: 15.1 m = 49.5 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 5 m = 16.4 ft and Navigational Clearance: 999.9 m = 3280.7 ft
Location
New York [51000]: Queens County [081], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0.1 MI E I678 + ROUTE 25A
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 24352 (2019) and Trucks: 6%
Future ADT: 24466 (In 2039 )
25AX(WB) TO I678 over RELIEF (Route: 0)
Num:00000000205580Ax
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 77.7 m = 254.9 ft
Main Spans: 16 at 7 m = 23.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.1 m = 23.3 ft (1 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.1 MI E JCT I678 & SH 25A
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.9 metric ton = 76.9 tons (Load Factor(LF) [1])
Inventory: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8857 (2016) and Trucks: 8%
Future ADT: 8898 (In 2039 )
RTE I678 over RELIEF (Route: 678)
Num:00000000105578Ix
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 117.3 m = 384.9 ft
Main Spans: 3 at 17.6 m = 57.7 ft
Approach Spans: 14
Skew: 1
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I495 & I678
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 25.6 metric ton = 28.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 18.8 metric ton = 20.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8582 (2003) and Trucks: 9%
Future ADT: 12015 (In 2023 )
RTE I678 over 25A (EB) U-TURN: FLUSHIN (Route: 678)
Num:00000000105578Hx
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 314.6 m = 1032.2 ft
Main Spans: 20 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 8.9 m = 29.2 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 4.8 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I495 + I678
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.3 metric ton = 71.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 10149 (2016) and Trucks: 8%
Future ADT: 12968 (In 2039 )
RTE I678 over Ramp to 678I SB: FLUSHIN (Route: 678)
Num:00000000105578Jx
Open: no restriction [A]
Built: 2009, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 911.4 m = 2990.3 ft
Main Spans: 18 at 93.4 m = 306.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 12.9 m = 42.3 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I495 & I678
Condition
Deck: Very Good [8]
Superstructure: Excellent [9]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 70.8 metric ton = 77.9 tons (Allowable Stress(AS) [2])
Inventory: 38.1 metric ton = 41.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 133885 (2019) and Trucks: 10%
Future ADT: 171078 (In 2039 )
RTE I678 over FLUSHING BAY PROMENADE: (Route: 678)
Num:1055913x
Open: no restriction [A]
Built: 1963, Reconstructed: 2008
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 1662.4 m = 5454.3 ft
Main Spans: 65 at 92.7 m = 304.1 ft
Approach Spans: 2
Skew: 5
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.8 m = 45.3 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 4.27 m = 14.0 ft and Navigational Clearance: 10.4 m = 34.1 ft
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT GCP+I678
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 79.6 metric ton = 87.6 tons ()
Inventory: 29.4 metric ton = 32.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 185043 (2018) and Trucks: 5%
Future ADT: 236447 (In 2039 )
25AX W TO 678IX S over RELIEF (Route: 0)
Num:00000000105591Ex
Open: no restriction [A]
Built: 1963, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 141.7 m = 464.9 ft
Main Spans: 7 at 16.4 m = 53.8 ft
Approach Spans: 9
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT GCP & I678
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 58.1 metric ton = 63.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 9736 (2017) and Trucks: 6%
Future ADT: 12440 (In 2039 )
RTE I678 over 25AX: 25AX E TO 25AX W: (Route: 678)
Num:00000000105591Dx
Open: no restriction [A]
Built: 1963, Reconstructed: 1996
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 240.5 m = 789.1 ft
Main Spans: 12 at 47.2 m = 154.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT GCP & I678
Condition
Deck: Excellent [9]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.6 metric ton = 92.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 10766 (2003) and Trucks: 9%
Future ADT: 15072 (In 2023 )
RTE I678 over BOAT BASIN PLACE: FLUSHI (Route: 678)
Num:1055911x
Open: no restriction [A]
Built: 1963, Reconstructed: 1996
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 1542.6 m = 5061.3 ft
Main Spans: 70 at 53 m = 173.9 ft
Approach Spans: 7
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (3 Lanes) and Out-To-Out: 14.7 m = 48.2 ft for a 16.8 m = 55.1 ft approaching roadway.
Vertical Clearance: 4.36 m = 14.3 ft and Navigational Clearance: 10.3 m = 33.8 ft
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT GCP+I678
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 70205 (2008) and Trucks: 10%
Future ADT: 0 (In 2028 )
Ramp to Linden Pl over Whitestone Expressway Se (Route: 0)
Num:1055916x
Open: no restriction [A]
Built: 2007, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 306.9 m = 1006.9 ft
Main Spans: 5 at 93.6 m = 307.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.6 m = 21.7 ft (2 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 6.6 m = 21.7 ft approaching roadway.
Vertical Clearance: 32.68 m = 107.2 ft and Navigational Clearance: 10.3 m = 33.8 ft
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
Flushing River
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 86.2 metric ton = 94.8 tons (Allowable Stress(AS) [2])
Inventory: 40.8 metric ton = 44.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 9000 (2012) and Trucks: 0%
Future ADT: 12600 (In 2032 )
RTE I678 over RTE 25A (Route: 678)
Num:00000000105591Cx
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 108.5 m = 356.0 ft
Main Spans: 5 at 27.1 m = 88.9 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT GCP & I678
Condition
Deck: Excellent [9]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 46.7 metric ton = 51.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 36 metric ton = 39.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 7277 (2003) and Trucks: 9%
Future ADT: 10188 (In 2023 )
ROOSEVELT AVENUE over 678I678IX5M11071: NYCTA (Route: 0)
Num:2240507x
Posted for load [P]
Built: 1924, Reconstructed: 2019
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Closed Grating [4] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 424 m = 1391.1 ft
Main Spans: 3 at 64.6 m = 212.0 ft
Approach Spans: 24
Skew: 4
Width, Roadway: 13 m = 42.7 ft (4 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 3.96 m = 13.0 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
OVER I678 & FLUSHING RVR
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 22.7 metric ton = 25.0 tons ()
Inventory: 22.7 metric ton = 25.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.4 km = 0.2 mi
Traffic
ADT: 16220 (2010) and Trucks: 7%
Future ADT: 16296 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider