HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


EAST DRIVE over TRANSV RD NO 3N (Route: 0)
Num:2246250x
Open: no restriction [A]
Built: 0, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 11.8 m = 38.7 ft
Approach Spans: 0
Skew: 27
Width, Roadway: 13.1 m = 43.0 ft (3 Lanes) and Out-To-Out: 35.1 m = 115.2 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
E END OF CENTRAL PARK
Condition
Deck: Not Applicable [N]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 40.9 metric ton = 45.0 tons ()
Inventory: 11.3 metric ton = 12.4 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 365 (2016) and Trucks: 6%
Future ADT: 443 (In 2039 )
WEST DRIVE over 86TH ST TRANSVERS (Route: 0)
Num:2246260x
Open: no restriction [A]
Built: 1920, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 12.1 m = 39.7 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 10.4 m = 34.1 ft (3 Lanes) and Out-To-Out: 34.1 m = 111.9 ft for a 10.3 m = 33.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
IN CENTRAL PARK
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 40.6 metric ton = 44.7 tons ()
Inventory: 11.2 metric ton = 12.3 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2719 (2011) and Trucks: 6%
Future ADT: 3303 (In 2039 )
EAST DRIVE over 79TH ST TRANSVERSE (Route: 0)
Num:2246230x
Open: no restriction [A]
Built: 1920, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.5 m = 41.0 ft
Main Spans: 1 at 12.1 m = 39.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13 m = 42.7 ft (2 Lanes) and Out-To-Out: 38.7 m = 127.0 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
IN CENTRAL PARK
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 42.7 metric ton = 47.0 tons ()
Inventory: 16.9 metric ton = 18.6 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 246 (2018) and Trucks: 14%
Future ADT: 298 (In 2039 )
WEST DRIVE over PED WALK OPP 82ST (Route: 0)
Num:2246360x
Open: no restriction [A]
Built: 1862, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 14.3 m = 46.9 ft
Main Spans: 1 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.1 m = 33.1 ft (3 Lanes) and Out-To-Out: 16.9 m = 55.4 ft for a 10 m = 32.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
CENTER OF CENTRAL PARK
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 42.2 metric ton = 46.4 tons ()
Inventory: 17.8 metric ton = 19.6 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 259 (2019) and Trucks: 10%
Future ADT: 314 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider