Bridge Type
Main Span(s): Masonry [8] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 6.4 m = 21.0 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.3 m = 40.4 ft (3 Lanes) and Out-To-Out: 17 m = 55.8 ft for a 12.1 m = 39.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
N END OF CENTRAL PARK
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 52.1 metric ton = 57.3 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 563 (2018) and Trucks: 6%
Future ADT: 683 (In 2039
)