HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 18


RTE I278 over BRONX RIVER AVE (Route: 278)
Num:1075819x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Not applicable [N] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 330.1 m = 1083.1 ft
Main Spans: 9 at 28.3 m = 92.9 ft
Approach Spans: 19
Skew: 0
Width, Roadway: 22.9 m = 75.1 ft (6 Lanes) and Out-To-Out: 28.3 m = 92.9 ft for a 23.5 m = 77.1 ft approaching roadway.
Vertical Clearance: 5.99 m = 19.7 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.2 MI E I278+I878
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 150527 (2019) and Trucks: 8%
Future ADT: 192343 (In 2039 )
RTE I278 over BRONX RIVER (Route: 278)
Num:2066672x
Open: no restriction [A]
Built: 1952, Reconstructed: 1993
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Other [9] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 95.1 m = 312.0 ft
Main Spans: 1 at 32.6 m = 107.0 ft
Approach Spans: 7
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (5 Lanes) and Out-To-Out: 21.9 m = 71.9 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 6.71 m = 22.0 ft and Navigational Clearance: 10.6 m = 34.8 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.1 MI E I278+I878
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 63 metric ton = 69.3 tons ()
Inventory: 27.6 metric ton = 30.4 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 75264 (2019) and Trucks: 8%
Future ADT: 96171 (In 2039 )
278I 278X1MR03E1 over RELIEF (Route: 0)
Num:00000000107581Ax
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 45.4 m = 149.0 ft
Main Spans: 7 at 7.6 m = 24.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.2 MI E JCT I278 & I878
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Inventory: 21.8 metric ton = 24.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 4655 (2016) and Trucks: 10%
Future ADT: 5948 (In 2039 )
RTE I278 over BRONX RIVER (Route: 278)
Num:2066671x
Open: no restriction [A]
Built: 1952, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Closed Grating [4] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 53.3 m = 174.9 ft
Main Spans: 1 at 29.2 m = 95.8 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 15.3 m = 50.2 ft (4 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 10.6 m = 34.8 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.1MI E I278+I878
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 60.9 metric ton = 67.0 tons ()
Inventory: 26.2 metric ton = 28.8 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 55675 (2010) and Trucks: 11%
Future ADT: 0 (In 2030 )
RTE I278 over CSX TRANS/HNTS PT (Route: 278)
Num:2076929x
Open: no restriction [A]
Built: 1950, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 6.7 m = 22.0 ft
Main Spans: 1 at 6 m = 19.7 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 44.7 m = 146.7 ft (10 Lanes) and Out-To-Out: 52.7 m = 172.9 ft for a 44.5 m = 146.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.1 MILE E JCT I278 & I895
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 75.3 metric ton = 82.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 150527 (2019) and Trucks: 8%
Future ADT: 192343 (In 2039 )
RTE I278 over AMTRAK/CSXT/P&W (Route: 278)
Num:2075351x
Open: no restriction [A]
Built: 1960, Reconstructed: 2012
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.5 m = 123.0 ft
Main Spans: 1 at 36.8 m = 120.7 ft
Approach Spans: 0
Skew: 41
Width, Roadway: 17.4 m = 57.1 ft (4 Lanes) and Out-To-Out: 28.8 m = 94.5 ft for a 18.6 m = 61.0 ft approaching roadway.
Vertical Clearance: 4.26 m = 14.0 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
JCT I95 & I278
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 98.9 metric ton = 108.8 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 55675 (2010) and Trucks: 11%
Future ADT: 0 (In 2030 )
RTE I278 over AMTRAK/CSXT/P&W (Route: 278)
Num:2075352x
Open: no restriction [A]
Built: 2013, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.5 m = 123.0 ft
Main Spans: 1 at 36.8 m = 120.7 ft
Approach Spans: 0
Skew: 41
Width, Roadway: 18.6 m = 61.0 ft (4 Lanes) and Out-To-Out: 26.9 m = 88.3 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 5.15 m = 16.9 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
JCT OF I95 & I278
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design:
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 75264 (2019) and Trucks: 8%
Future ADT: 96171 (In 2039 )
BRYANT AVENUE over AMTRAK/CSXT/P&W (Route: 0)
Num:2241210x
Open: no restriction [A]
Built: 1908, Reconstructed: 2013
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 27.1 m = 88.9 ft
Main Spans: 1 at 26.5 m = 86.9 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 14 m = 45.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT HUNTS POINT
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design:
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 6304 (2019) and Trucks: 5%
Future ADT: 8826 (In 2039 )
FAILE STREET over AMTRAK/CSXT/P&W (Route: 0)
Num:2241200x
Open: no restriction [A]
Built: 1906, Reconstructed: 1988
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 30.5 m = 100.1 ft
Main Spans: 1 at 29.2 m = 95.8 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 18.2 m = 59.7 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 7.99 m = 26.2 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT HUNTSPOINT
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.9 metric ton = 76.9 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 0 (2020) and Trucks: 4%
Future ADT: 0 (In 0 )
RTE I895 over FAILE STREET (Route: 895)
Num:00000000106666Hx
Open: no restriction [A]
Built: 1962, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 173.7 m = 569.9 ft
Main Spans: 8 at 23.1 m = 75.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.9 m = 22.6 ft (1 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
1 MI NE JCT I278 & I87
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 32039 (2018) and Trucks: 6%
Future ADT: 32189 (In 2039 )
RTE I278 over RELIEF (Route: 278)
Num:00000000106666Gx
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 147.8 m = 484.9 ft
Main Spans: 7 at 22.8 m = 74.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
1 MI NE JCT I278 & I87
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 150527 (2019) and Trucks: 8%
Future ADT: 192343 (In 2039 )
RTE I895 over SLOPE ADJ TO RR (Route: 895)
Num:1076690x
Open: no restriction [A]
Built: 1964, Reconstructed: 1991
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 181.4 m = 595.2 ft
Main Spans: 8 at 22.9 m = 75.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.9 MI S JCT I95 & I895
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 7031 (2016) and Trucks: 10%
Future ADT: 7064 (In 2039 )
WESTCHESTER AVE over RTE I895: RTE I895: NYC (Route: 0)
Num:1066717x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39.9 m = 130.9 ft
Main Spans: 2 at 18.8 m = 61.7 ft
Approach Spans: 0
Skew: 41
Width, Roadway: 19.5 m = 64.0 ft (5 Lanes) and Out-To-Out: 32 m = 105.0 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 8.99 m = 29.5 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 84.6 metric ton = 93.1 tons ()
Inventory: 29.4 metric ton = 32.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20676 (2019) and Trucks: 8%
Future ADT: 20773 (In 2039 )
WESTCHESTER AVE over AMTRAK/CSXT/P&W: NYCTA P (Route: 0)
Num:2241230x
Open: no restriction [A]
Built: 1907, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 30.2 m = 99.1 ft
Main Spans: 3 at 10.3 m = 33.8 ft
Approach Spans: 0
Skew: 58
Width, Roadway: 26.5 m = 86.9 ft (5 Lanes) and Out-To-Out: 34.8 m = 114.2 ft for a 26.5 m = 86.9 ft approaching roadway.
Vertical Clearance: 7.51 m = 24.6 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT PARKCHESTER
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 20676 (2019) and Trucks: 8%
Future ADT: 20773 (In 2039 )
WESTCHESTER AVE over NYCTA PELHAM LINE: BRONX (Route: 0)
Num:2240180x
Open: no restriction [A]
Built: 1937, Reconstructed: 1982
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 22.9 m = 75.1 ft
Main Spans: 1 at 22.5 m = 73.8 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 18.1 m = 59.4 ft (4 Lanes) and Out-To-Out: 22.3 m = 73.2 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 12.99 m = 42.6 ft and Navigational Clearance: 5.1 m = 16.7 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
OVER BRONX RIVER
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: Other [C]
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 20676 (2019) and Trucks: 8%
Future ADT: 20773 (In 2039 )
HUNTS POINT AVE over AMTRAK/CSXT/P&W (Route: 0)
Num:2241190x
Open: no restriction [A]
Built: 1908, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 30.8 m = 101.1 ft
Main Spans: 1 at 30.1 m = 98.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 21.3 m = 69.9 ft (5 Lanes) and Out-To-Out: 29.7 m = 97.4 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT HUNTS POINT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 66.2 metric ton = 72.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2018 [1218] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 11637 (2018) and Trucks: 12%
Future ADT: 14136 (In 2039 )
RTE I278 over BRUCKNER EXPWY EB: BRUCK (Route: 278)
Num:1066669x
Open: no restriction [A]
Built: 1960, Reconstructed: 2019
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 3826.5 m = 12554.7 ft
Main Spans: 176 at 39 m = 128.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (4 Lanes) and Out-To-Out: 27.4 m = 89.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 4.59 m = 15.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
1 MI NE I278+I87
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 150527 (2019) and Trucks: 8%
Future ADT: 192343 (In 2039 )
RTE I278 over HUNTS POINT AVE (Route: 278)
Num:00000000106666Fx
Open: no restriction [A]
Built: 1962, Reconstructed: 1996
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 231.6 m = 759.9 ft
Main Spans: 11 at 32.9 m = 107.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
1 MI NE JCT I278 & I87
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 149369 (1989) and Trucks: 9%
Future ADT: 209117 (In 2009 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider