HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 19


BE SERVICE ROAD over WESTCHESTER CREEK (Route: 0)
Num:1066510x
Open: no restriction [A]
Built: 1971, Reconstructed: 2006
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Mixed types [20]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 166.4 m = 546.0 ft
Main Spans: 1 at 21.9 m = 71.9 ft
Approach Spans: 16
Skew: 0
Width, Roadway: 17.7 m = 58.1 ft (4 Lanes) and Out-To-Out: 22.2 m = 72.8 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 5 m = 16.4 ft and Navigational Clearance: 999.9 m = 3280.7 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
JCT.I95-I678-I295 & I278
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 74.6 metric ton = 82.1 tons ()
Inventory: 13.1 metric ton = 14.4 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 7.4 km = 4.6 mi
Traffic
ADT: 6553 (2017) and Trucks: 8%
Future ADT: 6583 (In 2039 )
RTE I95 over Exit Ramp from I-678 NB: (Route: 95)
Num:1066509x
Open: no restriction [A]
Built: 1971, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 1010.4 m = 3315.1 ft
Main Spans: 28 at 53.9 m = 176.8 ft
Approach Spans: 0
Skew: 2
Width, Roadway: 39.9 m = 130.9 ft (3 Lanes) and Out-To-Out: 41.8 m = 137.1 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 4.85 m = 15.9 ft and Navigational Clearance: 18.2 m = 59.7 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278 & I295
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Basically intolerable requiring high priority of corrrective action [3] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 105427 (2017) and Trucks: 18%
Future ADT: 134714 (In 2039 )
RTE I278 over 95I 95IX1MR10A1: ZEREGA (Route: 278)
Num:00000000106650Bx
Open: no restriction [A]
Built: 1970, Reconstructed: 1999
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 246.3 m = 808.1 ft
Main Spans: 8 at 37.4 m = 122.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.3 m = 30.5 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 4.62 m = 15.2 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278 & I295
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 6551 (2003) and Trucks: 9%
Future ADT: 9171 (In 2023 )
RTE I95 over Bruckner Blvd Westbound: (Route: 95)
Num:00000000106653Ax
Open: no restriction [A]
Built: 1971, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 470.9 m = 1545.0 ft
Main Spans: 11 at 53.3 m = 174.9 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 10.6 m = 34.8 ft (2 Lanes) and Out-To-Out: 15.4 m = 50.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 5 m = 16.4 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I878 & I78
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 105427 (2017) and Trucks: 18%
Future ADT: 134714 (In 2039 )
I95 SERVICE RD EB over ZEREGA AVENUE (Route: 0)
Num:1076150x
Open: no restriction [A]
Built: 1951, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 66.8 m = 219.2 ft
Main Spans: 3 at 25.9 m = 85.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.9 m = 22.6 ft (2 Lanes) and Out-To-Out: 17.9 m = 58.7 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95+I878+I78
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 18011 (2019) and Trucks: 13%
Future ADT: 23014 (In 2039 )
BE SERVICE RD SB over RTE I278: ZEREGA AVE (Route: 0)
Num:1076130x
Open: no restriction [A]
Built: 1951, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 69.5 m = 228.0 ft
Main Spans: 3 at 26.8 m = 87.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 17.9 m = 58.7 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 4.39 m = 14.4 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95+I878+I78
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 9121 (2020) and Trucks: 8%
Future ADT: 9163 (In 2039 )
RTE I95 over RELIEF (Route: 95)
Num:00000000106650Cx
Open: no restriction [A]
Built: 1971, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 214.9 m = 705.1 ft
Main Spans: 6 at 36.8 m = 120.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10 m = 32.8 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278 & I295
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 105427 (2017) and Trucks: 18%
Future ADT: 134714 (In 2039 )
RTE I278 over RTE I278: RTE I278: RTE (Route: 278)
Num:00000000106652Ax
Open: no restriction [A]
Built: 1971, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 584.3 m = 1917.1 ft
Main Spans: 17 at 43.8 m = 143.7 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 4.77 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I878 & I78
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 86223 (2018) and Trucks: 10%
Future ADT: 110175 (In 2039 )
BE SERVICE RD SB over CBE SERVICE RD EB (Route: 0)
Num:1076140x
Open: no restriction [A]
Built: 1951, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 27.4 m = 89.9 ft
Main Spans: 1 at 25.6 m = 84.0 ft
Approach Spans: 0
Skew: 51
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 13.6 m = 44.6 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95+I878+I78
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.9 metric ton = 65.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 9121 (2020) and Trucks: 8%
Future ADT: 9163 (In 2039 )
RTE I95 over I-278 EB Ramp to I-295/: (Route: 95)
Num:00000000106650Ax
Open: no restriction [A]
Built: 1970, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 336.2 m = 1103.1 ft
Main Spans: 11 at 38.7 m = 127.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (1 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278 & I295
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.1 metric ton = 84.8 tons (Load Factor(LF) [1])
Inventory: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 18011 (2019) and Trucks: 13%
Future ADT: 23014 (In 2039 )
RTE I678 over RELIEF (Route: 678)
Num:00000000106653Bx
Open: no restriction [A]
Built: 1971, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 70.4 m = 231.0 ft
Main Spans: 2 at 34.7 m = 113.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.8 m = 19.0 ft (1 Lanes) and Out-To-Out: 6.8 m = 22.3 ft for a 4.3 m = 14.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I878 & I78
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 0 (2020) and Trucks: 9%
Future ADT: 0 (In 0 )
RTE I95 over BE NB SERVICE RD (Route: 95)
Num:00000000106650Dx
Open: no restriction [A]
Built: 1970, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 132 m = 433.1 ft
Main Spans: 5 at 27.1 m = 88.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.1 m = 36.4 ft (2 Lanes) and Out-To-Out: 12 m = 39.4 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278 & I295
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 24277 (2019) and Trucks: 14%
Future ADT: 31021 (In 2039 )
BE SB SERVICE RD over RTE 908A: RTE 908A (Route: 0)
Num:2076129x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 35.3 m = 115.8 ft
Main Spans: 2 at 17 m = 55.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.3 m = 46.9 ft (3 Lanes) and Out-To-Out: 19.4 m = 63.7 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
JCT.I95 + I678 + I278
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 55.8 metric ton = 61.4 tons ()
Inventory: 22.4 metric ton = 24.6 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 0 (2020) and Trucks: 10%
Future ADT: 0 (In 0 )
RTE I278 over Brush Avenue: Hutchinson (Route: 278)
Num:1066529x
Open: no restriction [A]
Built: 1971, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 820.5 m = 2692.1 ft
Main Spans: 21 at 52.7 m = 172.9 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 25.6 m = 84.0 ft (5 Lanes) and Out-To-Out: 28.6 m = 93.8 ft for a 32.6 m = 107.0 ft approaching roadway.
Vertical Clearance: 4.41 m = 14.5 ft and Navigational Clearance: 18.2 m = 59.7 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95 & I278 & I678
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 86223 (2018) and Trucks: 10%
Future ADT: 110175 (In 2039 )
RTE I95 over RTE I278: RTE I278: WEST (Route: 95)
Num:1066539x
Open: no restriction [A]
Built: 1971, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 835.8 m = 2742.3 ft
Main Spans: 21 at 52.7 m = 172.9 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 11.6 m = 38.1 ft (3 Lanes) and Out-To-Out: 16.3 m = 53.5 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 30.17 m = 99.0 ft and Navigational Clearance: 17 m = 55.8 ft
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95&I878&I78
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 86223 (2018) and Trucks: 10%
Future ADT: 110175 (In 2039 )
BE NB SERVICE RD over RTE 908A: RTE 908A (Route: 0)
Num:2076109x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 36.3 m = 119.1 ft
Main Spans: 2 at 17.3 m = 56.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14 m = 45.9 ft (3 Lanes) and Out-To-Out: 19.3 m = 63.3 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
JCT.I95 + I678 + I278
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 55.7 metric ton = 61.3 tons ()
Inventory: 22.3 metric ton = 24.5 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 11326 (2019) and Trucks: 10%
Future ADT: 14472 (In 2039 )
BE NB SERVICE RD over RTE I95: 908A NB TO 95I (Route: 0)
Num:1076110x
Open: no restriction [A]
Built: 1971, Reconstructed: 2001
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 44.5 m = 146.0 ft
Main Spans: 2 at 21.6 m = 70.9 ft
Approach Spans: 0
Skew: 49
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 11.6 m = 38.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.69 m = 15.4 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
JCT I95+I878+I78
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 6553 (2017) and Trucks: 8%
Future ADT: 6583 (In 2039 )
LAFAYETTE AVENUE over RTE I678: RTE I678 (Route: 0)
Num:1075360x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 45.1 m = 148.0 ft
Main Spans: 1 at 43.8 m = 143.7 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 18.6 m = 61.0 ft (5 Lanes) and Out-To-Out: 25.6 m = 84.0 ft for a 18.6 m = 61.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.3 MI S JCT I95 & I878
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 12125 (2017) and Trucks: 3%
Future ADT: 16975 (In 2037 )
CASTLE HILL AVE over RTE I278: RTE I278: RTE (Route: 0)
Num:1066700x
Open: no restriction [A]
Built: 1968, Reconstructed: 2015
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 50.6 m = 166.0 ft
Main Spans: 3 at 16.4 m = 53.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 22.6 m = 74.2 ft (4 Lanes) and Out-To-Out: 29.3 m = 96.1 ft for a 22.6 m = 74.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
.7 MI W I878+I95
Condition
Deck: Excellent [9]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8726 (2019) and Trucks: 12%
Future ADT: 17123 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider