HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


RTE 907H over BOSTON RD BX ZOO (Route: 907)
Num:2065629x
Open: no restriction [A]
Built: 1949, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 1 at 17 m = 55.8 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 29.6 m = 97.1 ft (8 Lanes) and Out-To-Out: 35.7 m = 117.1 ft for a 29.6 m = 97.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.18 MI S JCT BRPC & BRP
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 55.1 metric ton = 60.6 tons ()
Inventory: 20.1 metric ton = 22.1 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 119529 (2018) and Trucks: 2%
Future ADT: 147379 (In 2039 )
WHITE PLAINS ROAD over AMTRAK/CSXT/P&W (Route: 0)
Num:2241329x
Open: no restriction [A]
Built: 1905, Reconstructed: 1981
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 32.6 m = 107.0 ft
Main Spans: 1 at 31.3 m = 102.7 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 30.3 m = 99.4 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 4.49 m = 14.7 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT PARKCHESTER
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 59 metric ton = 64.9 tons ()
Inventory: 20.3 metric ton = 22.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 14614 (2019) and Trucks: 8%
Future ADT: 17753 (In 2039 )
UNION PORT ROAD over AMTRAK/CSXT/P&W (Route: 0)
Num:2241330x
Open: no restriction [A]
Built: 1906, Reconstructed: 1981
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 39.6 m = 129.9 ft
Main Spans: 1 at 37.7 m = 123.7 ft
Approach Spans: 0
Skew: 33
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 18.1 m = 59.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 4.44 m = 14.6 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
AT WESTCHESTER HEIGHTS
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 69.2 metric ton = 76.1 tons ()
Inventory: 22.3 metric ton = 24.5 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 6477 (2016) and Trucks: 5%
Future ADT: 9068 (In 2036 )
BOSTON RD over BRONX RIVER (Route: 0)
Num:2242110x
Open: no restriction [A]
Built: 1920, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39.3 m = 128.9 ft
Main Spans: 1 at 33.2 m = 108.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (2 Lanes) and Out-To-Out: 14.8 m = 48.6 ft for a 10.6 m = 34.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
IN BRONX PARK
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 61.8 metric ton = 68.0 tons ()
Inventory: 20.9 metric ton = 23.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 0 (2020) and Trucks: 5%
Future ADT: 0 (In 0 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider