HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


SNUFF MILL RD. over Pedestrian Foot Path: BR (Route: 0)
Num:2242220x
Open: no restriction [A]
Built: 1920, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 41.4 m = 135.8 ft
Main Spans: 2 at 17.6 m = 57.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 6 m = 19.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
IN BRONX PARK
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 36.7 metric ton = 40.4 tons ()
Inventory: 16.8 metric ton = 18.5 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 50 (2009) and Trucks: 10%
Future ADT: 70 (In 2029 )
RTE 1 over BRONX RIVER (Route: 1)
Num:2242010x
Open: no restriction [A]
Built: 1907, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 29 m = 95.1 ft
Main Spans: 1 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8 m = 26.2 ft (4 Lanes) and Out-To-Out: 30.7 m = 100.7 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
JCT US1 & BRONX RIVER
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 54.4 metric ton = 59.8 tons ()
Inventory: 19.4 metric ton = 21.3 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 32103 (2018) and Trucks: 7%
Future ADT: 32253 (In 2039 )
RTE 907H over RTE 907F: 907F X(WB) (Route: 907)
Num:1067119x
Open: no restriction [A]
Built: 1949, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 41.5 m = 136.2 ft
Main Spans: 2 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 30 m = 98.4 ft (8 Lanes) and Out-To-Out: 34.4 m = 112.9 ft for a 29 m = 95.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by State Highway Agency [01], DOT District: 0
1.4MI N I95+BX RIVER PKWY
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 119529 (2018) and Trucks: 2%
Future ADT: 147379 (In 2039 )
SOUTHERN BLVD over RTE 1: 1 FORDHAM RD EB (Route: 0)
Num:2242029x
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39.6 m = 129.9 ft
Main Spans: 2 at 19.2 m = 63.0 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 21.3 m = 69.9 ft (4 Lanes) and Out-To-Out: 31.4 m = 103.0 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0.4 MI W OF US 1 & BRPC
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 86.3 metric ton = 94.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 19551 (2019) and Trucks: 6%
Future ADT: 19642 (In 2039 )
CROTONA AVENUE over 1 ( WB FORDHAM RD): RTE (Route: 0)
Num:2242030x
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 29.3 m = 96.1 ft
Main Spans: 2 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 25.3 m = 83.0 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.5 MILE W JCT US 1 & BRPC
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 81.6 metric ton = 89.8 tons ()
Inventory: 29.4 metric ton = 32.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 11173 (2018) and Trucks: 4%
Future ADT: 11225 (In 2039 )
BOSTON RD over BRONX RIVER (Route: 0)
Num:2242110x
Open: no restriction [A]
Built: 1920, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39.3 m = 128.9 ft
Main Spans: 1 at 33.2 m = 108.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (2 Lanes) and Out-To-Out: 14.8 m = 48.6 ft for a 10.6 m = 34.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
IN BRONX PARK
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 61.8 metric ton = 68.0 tons ()
Inventory: 20.9 metric ton = 23.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 0 (2020) and Trucks: 5%
Future ADT: 0 (In 0 )
RTE 907H over BOSTON RD BX ZOO (Route: 907)
Num:2065629x
Open: no restriction [A]
Built: 1949, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 1 at 17 m = 55.8 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 29.6 m = 97.1 ft (8 Lanes) and Out-To-Out: 35.7 m = 117.1 ft for a 29.6 m = 97.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.18 MI S JCT BRPC & BRP
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 55.1 metric ton = 60.6 tons ()
Inventory: 20.1 metric ton = 22.1 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 119529 (2018) and Trucks: 2%
Future ADT: 147379 (In 2039 )
PARKRD SO ALLERT over BRONX RIVER (Route: 0)
Num:2242210x
Open: no restriction [A]
Built: 1951, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface:
Bridge Dimensions
Length: 50 m = 164.1 ft
Main Spans: 3 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 6 m = 19.7 ft (2 Lanes) and Out-To-Out: 11.5 m = 37.7 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Bronx County [005], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
IN BRONX PARK
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 59.9 metric ton = 65.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 100 (2009) and Trucks: 10%
Future ADT: 140 (In 2029 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider