Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21.9 m = 71.9 ft
Main Spans: 1 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Greenwood [31376]: Clearfield County [033], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 2
2 MI SW CURRY RUN
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 64.2 metric ton = 70.6 tons (Unknown [F])
Inventory: 40.2 metric ton = 44.2 tons (Unknown [F])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 9.7 km = 6.0 mi
Traffic
ADT: 2492 (2019) and Trucks: 12%
Future ADT: 3907 (In 2040
)