Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 159.1 m = 522.0 ft
Main Spans: 5 at 42.2 m = 138.5 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 5.2 m = 17.1 ft (1 Lanes) and Out-To-Out: 6.2 m = 20.3 ft for a 5.2 m = 17.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Yonkers [84000]: Westchester County [119], New York [36]
Owned by County Highway Agency [02], DOT District: 87
100' SW JCT 907G & 984E
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 10000 (2009) and Trucks: 0%
Future ADT: 14000 (In 2029
)