Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 1 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 22.6 m = 74.2 ft (6 Lanes) and Out-To-Out: 28.3 m = 92.9 ft for a 22.6 m = 74.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hackensack [28680]: Bergen County [003], New Jersey [34]
Owned by County Highway Agency [02], DOT District: 1
.3 MI N OF NJ 4
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Inventory: 12.7 metric ton = 14.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17084 (2020) and Trucks: 4%
Future ADT: 20846 (In 2040
)