HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


BROADWAY over MNRR NH LINE (Route: 0)
Num:2262250x
Posted for load [P]
Built: 1887, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Wood or timber [7] Stringer/Multi-beam or girder [02]
Deck: Wood or Timber [8] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 19.8 m = 65.0 ft
Main Spans: 1 at 16.4 m = 53.8 ft
Approach Spans: 1
Skew: 7
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Harrison [32402]: Westchester County [119], New York [36]
Owned by Railroad [27], DOT District: 87
1.2 MI N MAMARONECK RYE
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design:
Operating: 20 metric ton = 22.0 tons (Allowable Stress(AS) [2])
Inventory: 14.5 metric ton = 16.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 3204 (2014) and Trucks: 2%
Future ADT: 4486 (In 2034 )
RTE 127 over MNRR NH LINE: PARKING LO (Route: 127)
Num:1037550x
Open: no restriction [A]
Built: 1927, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 2 at 18.8 m = 61.7 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 10.1 m = 33.1 ft (2 Lanes) and Out-To-Out: 15 m = 49.2 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Harrison [32402]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
1.3 MI N JCT SH 127 & US1
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78 metric ton = 85.8 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 10447 (2016) and Trucks: 3%
Future ADT: 12691 (In 2039 )
NELSON AVENUE over 95IX: RTE I95 (Route: 0)
Num:5514720x
Open: no restriction [A]
Built: 1954, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 54.6 m = 179.1 ft
Main Spans: 4 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Harrison [32402]: Westchester County [119], New York [36]
Owned by State Toll Authority [31], DOT District: 87
0.1 MI W JCT RTS I95<127
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 52.2 metric ton = 57.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 40.2 metric ton = 44.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 4441 (2017) and Trucks: 1%
Future ADT: 6217 (In 2037 )
RTE 127 over RTE I95 (Route: 127)
Num:1037560x
Open: no restriction [A]
Built: 1996, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 54.6 m = 179.1 ft
Main Spans: 2 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 15.8 m = 51.8 ft (2 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Harrison [32413]: Westchester County [119], New York [36]
Owned by State Toll Authority [31], DOT District: 87
JCT SH 127 & I95
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 76.2 metric ton = 83.8 tons (Load Factor(LF) [1])
Inventory: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 10447 (2016) and Trucks: 3%
Future ADT: 12691 (In 2039 )
WEST STREET over MNRR NH LINE (Route: 0)
Num:7712540x
Posted for load [P]
Built: 1887, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Wood or timber [7] Stringer/Multi-beam or girder [02]
Deck: Wood or Timber [8] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.1 m = 65.9 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 1
Skew: 8
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Harrison [32402]: Westchester County [119], New York [36]
Owned by Railroad [27], DOT District: 87
.8 MI N OF MAMARONECK RYE
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 20 metric ton = 22.0 tons (Allowable Stress(AS) [2])
Inventory: 13.6 metric ton = 15.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5165 (2015) and Trucks: 2%
Future ADT: 7231 (In 2035 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider