Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 78.5 m = 257.6 ft
Main Spans: 3 at 22 m = 72.2 ft
Approach Spans: 2
Skew: 32
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Wabash County [169], Indiana [18]
Owned by County Highway Agency [02], DOT District: 2
00.10 N OF CR 1000 N
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 970 (2014) and Trucks: 5%
Future ADT: 1440 (In 2034
)