HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 7


HIGHLAND LAKES RD over BOULDER CREEK (Route: 0)
Num: 06C0349x
Open: no restriction [A]
Built: 1928, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 44.2 m = 145.0 ft
Main Spans: 1 at 24.9 m = 81.7 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by County Highway Agency [02], DOT District: 2
RIGHT OF I-5
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 42.4 metric ton = 46.6 tons (Load Factor(LF) [1])
Inventory: 25.6 metric ton = 28.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 10 (2013) and Trucks: 5%
Future ADT: 30 (In 2036 )
INTERSTATE 5 NB over SACRAMENTO:UP RR:AMTRAK (Route: 5)
Num: 06 0193Rx
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 203.6 m = 668.0 ft
Main Spans: 4 at 61 m = 200.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by State Highway Agency [01], DOT District: 2
02-SHA-005-R52.11
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8550 (2009) and Trucks: 32%
Future ADT: 15245 (In 2040 )
INTERSTATE 5 SB over SACRAMENTO:UP RR:AMTRAK (Route: 5)
Num: 06 0193Lx
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 229.2 m = 752.0 ft
Main Spans: 4 at 73.2 m = 240.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by State Highway Agency [01], DOT District: 2
02-SHA-005-R52.11
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8550 (2009) and Trucks: 32%
Future ADT: 15245 (In 2040 )
INTERSTATE 5 SB over SACRAMENTO:UP RR:AMTRAK (Route: 5)
Num: 06 0192Lx
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 263.7 m = 865.2 ft
Main Spans: 4 at 73.2 m = 240.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by State Highway Agency [01], DOT District: 2
02-SHA-005-R51.80
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8550 (2009) and Trucks: 32%
Future ADT: 15245 (In 2040 )
INTERSTATE 5 NB over SACRAMENTO:UP RR:AMTRAK (Route: 5)
Num: 06 0192Rx
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 263 m = 862.9 ft
Main Spans: 4 at 73.2 m = 240.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by State Highway Agency [01], DOT District: 2
02-SHA-005-R51.80
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8550 (2009) and Trucks: 32%
Future ADT: 15245 (In 2040 )
INTERSTATE 5 NB over FRONTAGE ROAD (Route: 5)
Num: 06 0194Rx
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 1 at 30.9 m = 101.4 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.7 m = 41.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by State Highway Agency [01], DOT District: 2
02-SHA-005-52.84
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8550 (2009) and Trucks: 32%
Future ADT: 15245 (In 2040 )
INTERSTATE 5 SB over FRONTAGE ROAD (Route: 5)
Num: 06 0194Lx
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 1 at 30.9 m = 101.4 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.7 m = 41.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Shasta County [089], California [06]
Owned by State Highway Agency [01], DOT District: 2
02-SHA-005-52.84
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8550 (2009) and Trucks: 32%
Future ADT: 15245 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.