SR 642 over W.B. SUSQUEHANNA RIVER (Route: 642)
Num:29116x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 400.2 m = 1313.1 ft
Main Spans: 9 at 44.5 m = 146.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Milton [50016]: Northumberland County [097], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 3
MILTON/ISLAND RIVER BR.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 72.6 metric ton = 79.9 tons (Load Factor(LF) [1])
Inventory: 13.6 metric ton = 15.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.8 km = 1.1 mi
Traffic
ADT: 11406 (2021) and Trucks: 4%
Future ADT: 14234 (In 2032 )
SR 405 over LIMESTONE RUN (Route: 405)
Num:29104x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 6.1 m = 20.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 0 m = 0.0 ft (4 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 19.8 m = 65.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Milton [50016]: Northumberland County [097], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 3
BORO OF MILTON
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 10168 (2019) and Trucks: 3%
Future ADT: 15583 (In 2032 )
FILBERT ST over LIMESTONE RUN (Route: 0)
Num:29408x
Open: no restriction [A]
Built: 1910, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 20.4 m = 66.9 ft
Main Spans: 1 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Milton [50016]: Northumberland County [097], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 3
MILTON BORO
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.6 metric ton = 68.9 tons ()
Inventory: 37.2 metric ton = 40.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4900 (2019) and Trucks: 2%
Future ADT: 7575 (In 2039 )
SR 642 over W.B. SUSQUEHANNA RIVER (Route: 642)
Num:29115x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 188.7 m = 619.1 ft
Main Spans: 5 at 37.5 m = 123.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Milton [50016]: Northumberland County [097], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 3
W.MILTON/ISLAND RIVER BR.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 11406 (2021) and Trucks: 4%
Future ADT: 14234 (In 2032 )
MAPLE AVENUE over LIMESTONE RUN (Route: 0)
Num:29410x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 16.2 m = 53.2 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Milton [50016]: Northumberland County [097], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 3
MILTON BORO
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.9 metric ton = 76.9 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 630 (2009) and Trucks: 2%
Future ADT: 974 (In 2031 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.