HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


HARRISON ST over ST MARYS RIVER (Route: 0)
Num:200257x
Open: no restriction [A]
Built: 1915, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 112.8 m = 370.1 ft
Main Spans: 4 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 11.3 m = 37.1 ft (3 Lanes) and Out-To-Out: 15.4 m = 50.5 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Wayne [25000]: Allen County [003], Indiana [18]
Owned by County Highway Agency [02], DOT District: 2
00.10 N OF W SUPERIOR ST
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.6 metric ton = 68.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4525 (2016) and Trucks: 5%
Future ADT: 7500 (In 2036 )
US 27 SB over ST MARY'S RIVER (Route: 27)
Num:80060x
Open: no restriction [A]
Built: 2011, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 84.7 m = 277.9 ft
Main Spans: 3 at 28.2 m = 92.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (3 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 5.01 m = 16.4 ft and Navigational Clearance: 0 = N/A
Location
Fort Wayne [25000]: Allen County [003], Indiana [18]
Owned by State Highway Agency [01], DOT District: 2
02.32 S SR 930
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 88 metric ton = 96.8 tons (Load Factor(LF) [1])
Inventory: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 23872 (2019) and Trucks: 5%
Future ADT: 26070 (In 2030 )
EWING ST NB over ST MARYS RIVER (Route: 0)
Num:200662x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 80.8 m = 265.1 ft
Main Spans: 5 at 15.9 m = 52.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 14.4 m = 47.2 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Wayne [25000]: Allen County [003], Indiana [18]
Owned by County Highway Agency [02], DOT District: 2
00.10 N OF W SUPERIOR ST
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10100 (2016) and Trucks: 5%
Future ADT: 14000 (In 2036 )
EWING ST SB over ST MARYS RIVER (Route: 0)
Num:200663x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 80.8 m = 265.1 ft
Main Spans: 5 at 15.9 m = 52.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 14.4 m = 47.2 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Wayne [25000]: Allen County [003], Indiana [18]
Owned by County Highway Agency [02], DOT District: 2
00.10 N OF W SUPERIOR ST
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10100 (2016) and Trucks: 5%
Future ADT: 14000 (In 2036 )
US 27 NB over ST MARY'S RIVER (Route: 27)
Num:7490x
Open: no restriction [A]
Built: 1959, Reconstructed: 1988
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 94.5 m = 310.1 ft
Main Spans: 4 at 25.6 m = 84.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (3 Lanes) and Out-To-Out: 17.6 m = 57.7 ft for a 13.7 m = 44.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Wayne [25000]: Allen County [003], Indiana [18]
Owned by State Highway Agency [01], DOT District: 2
02.60 S SR 930
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 47.2 metric ton = 51.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 36.3 metric ton = 39.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 20087 (2019) and Trucks: 14%
Future ADT: 46885 (In 2034 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider