HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 6


SR 8 & SR 59 over NORTH ST L CUY RIV & RRS (Route: 8)
Num:7700369x
Open: no restriction [A]
Built: 1953, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 482.5 m = 1583.1 ft
Main Spans: 3 at 109.7 m = 359.9 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 24.4 m = 80.1 ft (6 Lanes) and Out-To-Out: 25.3 m = 83.0 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [01000]: Summit County [153], Ohio [39]
Owned by State Highway Agency [01], DOT District: 4
0.47 MI N OF SR 18
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 119115 (2015) and Trucks: 4%
Future ADT: 165332 (In 2038 )
NORTH ST over LITTLE CUYAHOGA RIVER (Route: 0)
Num:7730101x
Open: no restriction [A]
Built: 1956, Reconstructed: 1993
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 44.5 m = 146.0 ft
Main Spans: 3 at 16.8 m = 55.1 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [01000]: Summit County [153], Ohio [39]
Owned by County Highway Agency [02], DOT District: 4
250 FT W OF ARLINGTON ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 55.1 metric ton = 60.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 10344 (2015) and Trucks: 5%
Future ADT: 14357 (In 2038 )
SR 59 over SR 8 (Route: 59)
Num:7700334x
Open: no restriction [A]
Built: 1953, Reconstructed: 1986
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 36.9 m = 121.1 ft
Main Spans: 2 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 18 m = 59.1 ft (4 Lanes) and Out-To-Out: 20.1 m = 65.9 ft for a 18 m = 59.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [01000]: Summit County [153], Ohio [39]
Owned by State Highway Agency [01], DOT District: 4
1.53 MI S OF IR 77
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 22.7 metric ton = 25.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 16.2 metric ton = 17.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 15781 (2015) and Trucks: 2%
Future ADT: 150641 (In 2038 )
FORGE STREET over SR 8 (Route: 8)
Num:7700245x
Open: no restriction [A]
Built: 1953, Reconstructed: 2003
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 49.1 m = 161.1 ft
Main Spans: 2 at 22.6 m = 74.2 ft
Approach Spans: 0
Skew: 29
Width, Roadway: 14 m = 45.9 ft (4 Lanes) and Out-To-Out: 18.9 m = 62.0 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [01000]: Summit County [153], Ohio [39]
Owned by State Highway Agency [01], DOT District: 4
1.37 MI S OF IR 77
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 38.9 metric ton = 42.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 29.2 metric ton = 32.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 60226 (2015) and Trucks: 4%
Future ADT: 150641 (In 2038 )
SR 59 PERKINS ST. over OVER CSX TRANSPORTATION (Route: 59)
Num:7702051x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.4 m = 89.9 ft
Main Spans: 1 at 26.5 m = 86.9 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 12.2 m = 40.0 ft (4 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [01000]: Summit County [153], Ohio [39]
Owned by State Highway Agency [01], DOT District: 4
UNION ST. TO PROSPECT ST.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 68 metric ton = 74.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16760 (2015) and Trucks: 4%
Future ADT: 23263 (In 2038 )
SR 18 over OVER SUM-SR 8-1.47 (Route: 18)
Num:7708297x
Open: no restriction [A]
Built: 2002, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 38.4 m = 126.0 ft
Main Spans: 2 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 22
Width, Roadway: 18.3 m = 60.0 ft (5 Lanes) and Out-To-Out: 25.1 m = 82.4 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [01000]: Summit County [153], Ohio [39]
Owned by State Highway Agency [01], DOT District: 4
JCT OF SR 18 AND SR 8
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 42.1 metric ton = 46.3 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 32.4 metric ton = 35.6 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17997 (2015) and Trucks: 6%
Future ADT: 24980 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider