HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


ROUTE 15 over RIPPOWAM RIVER (Route: 15)
Num:705x
Posted for other load-capacity restriction [R]
Built: 1936, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 17.1 m = 56.1 ft
Main Spans: 1 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 17.7 m = 58.1 ft (4 Lanes) and Out-To-Out: 20.1 m = 65.9 ft for a 17.7 m = 58.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stamford [73070]: Fairfield County [001], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 3
0.5 MI SOUTH OF ROUTE 137
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 86.5 metric ton = 95.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 60500 (2015) and Trucks: 1%
Future ADT: 89897 (In 2035 )
STUDIO ROAD over RIPPOWAM RIVER (Route: 0)
Num:5506x
Open: no restriction [A]
Built: 2005, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 19.5 m = 64.0 ft
Main Spans: 1 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.2 m = 23.6 ft (2 Lanes) and Out-To-Out: 8.4 m = 27.6 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stamford [73070]: Fairfield County [001], Connecticut [09]
Owned by City or Municipal Highway Agency [04], DOT District: 3
700' FROM WIRE MILL ROAD
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 73.6 metric ton = 81.0 tons (Load Factor(LF) [1])
Inventory: 42.9 metric ton = 47.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 60 (2019) and Trucks: 2%
Future ADT: 89 (In 2039 )
WIRE MILL ROAD over ROUTE 15 (Route: 0)
Num:704x
Open: no restriction [A]
Built: 1938, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 20.7 m = 67.9 ft
Main Spans: 1 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stamford [73070]: Fairfield County [001], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 3
0.4 MI NORTH OF ROUTE 104
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 52.6 metric ton = 57.9 tons ()
Inventory: 30.8 metric ton = 33.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4193 (2020) and Trucks: 4%
Future ADT: 6230 (In 2040 )
CEDAR HEIGHTS ROAD over RIPPOWAM RIVER (Route: 0)
Num:4067x
Open: no restriction [A]
Built: 1933, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.8 m = 32.2 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stamford [73070]: Fairfield County [001], Connecticut [09]
Owned by City or Municipal Highway Agency [04], DOT District: 3
0.75 MI W OF ROUTE 137
Condition
Deck: Fair [5]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 49.2 metric ton = 54.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 37.9 metric ton = 41.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 3290 (2020) and Trucks: 3%
Future ADT: 4889 (In 2040 )
WIRE MILL ROAD over HAVILAND BROOK (Route: 0)
Num:4070x
Posted for load [P]
Built: 1957, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.6 m = 24.9 ft
Main Spans: 1 at 6.7 m = 22.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.3 m = 30.5 ft (2 Lanes) and Out-To-Out: 10.2 m = 33.5 ft for a 9.3 m = 30.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stamford [73070]: Fairfield County [001], Connecticut [09]
Owned by City or Municipal Highway Agency [04], DOT District: 3
0.3 MI W OF ROUTE 137
Condition
Deck: Serious [3]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 14.9 metric ton = 16.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 11.7 metric ton = 12.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 1840 (2020) and Trucks: 3%
Future ADT: 2734 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.