Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 1 at 8.1 m = 26.6 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New Canaan [50580]: Fairfield County [001], Connecticut [09]
Owned by Town or Township Highway Agency [03], DOT District: 3
B/T MPKWY EXIT 37 & 38
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 1999 [199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 590 (2019) and Trucks: 2%
Future ADT: 877 (In 2039
)