Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface:
Bridge Dimensions
Length: 37.2 m = 122.1 ft
Main Spans: 2 at 17.6 m = 57.7 ft
Approach Spans: 0
Skew: 33
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 14.3 m = 46.9 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ramapo [60510]: Rockland County [087], New York [36]
Owned by State Park: Forest: or Reservation Agency [11], DOT District: 85
JCT RTE 45+PIP
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 53 metric ton = 58.3 tons ()
Inventory: 13.4 metric ton = 14.7 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 11148 (2018) and Trucks: 6%
Future ADT: 11200 (In 2039
)